[1] 纪静,谢开贵,曹侃,等. 广东2010年规划电网的可靠性评估[J]. 中国电力,2011,44(2):1-5. JI Jing, XIE Kai-gui, CAO Kan, et al . Reliability evaluation of Guangdong planned power grid in 2010 [J]. Electric Power, 2011, 44(2): 1-5. [2] LI W, ZHOU J, XIONG X. Fuzzy models of overhead power line weather-related outages [J]. IEEE Transactions on Power Systems, 2008, 23(3): 1529-1531. [3] 周家启,赵霞. 电力系统风险评估方法和应用实例研究[J]. 中国电力,2006,39(8):77-81. ZHOU Jia-qi, ZHAO Xia. Models and methods applied to risk assessment of power systems [J]. Electric Power, 2006, 39(8): 77-81. [4] 王韶,周家启. 双回平行输电线路可靠性模型[J]. 中国电机工程学报,2003,23(9):53-56. WANG Shao, ZHOU Jia-qi. A reliability evaluation model for two transmission lines in parallel[J]. Proceedings of the CSEE,2003, 23(9): 53-56. [5] 吴昊,薛贵挺,张焰,等. 考虑线路多种停运模式的静态电压稳定风险评估[J]. 现代电力,2011,28(3):1-6. WU Hao, XUE Gui-ting, ZHANG Yan, et al . Risk Assessment of static voltage stability by considering multiple outage model of lines [J]. Modern Electric Power, 2011, 28(3): 1-6. [6] 林智敏,林韩,温步瀛. 基于分离模型的双回平行输电线路可靠性评估[J]. 华东电力,2008,36(7):34-37. LIN Zhi-min, LIN Han, WEN Bu-ying. Reliability evaluation for parallel two-circuit transmission lines by using individual models[J]. East China Electric Power, 2008, 36(7): 34-37. [7] 何金定,贺星棋. 考虑可修多状态的输电线路可靠性评估模型[J]. 电力系统保护与控制,2010,38(4):11-14. HE Jin-ding, HE Xing-qi. Evaluation model of reliability for overhead transmission line with considerations of repairable multi-state[J]. Power System Protection and Control, 2010, 38(4):11-14. [8] 张勇平,刘鸿斌,邓春,等. 沽太500 kV双回线路覆冰舞动故障分析[J]. 中国电力,2010,43(3):27-30. ZHANG Yong-ping, LIU Hong-bin, DENG Chun, et al . Analysis of 500 kV Gu-Tai transmission line ice-coating galloping[J].Electric Power, 2010, 43(3): 27-30. [9] 盂毅,陈继东,胡丹晖. 架空输电线路覆冰在线监测系统的运行[J]. 中国电力,2011,44(5):38-40. MENG Yi, CHEN Ji-dong, HU Dan-hui. Application of an icing on-line monitoring system in overhead transmission lines[J].Electric Power, 2011, 44(5): 38-40. [10] 谢运华,王坚. 川西南导线覆冰时空分布规律的研究[J]. 中国电力,2013,46(3):30-34. XIE Yun-hua, WANG Jian. Study on spatiotemporal distribution of conductor icing in southwestern Sichuan[J]. Electric Power, 2013, 46(3): 30-34. [11] 何剑,程林,孙元章,等. 条件相依的输变电设备短期可靠性模型[J]. 中国电机工程学报,2009,29(7):39-46. HE Jian, CHENG Lin, SUN Yuan-zhang, et al . Condition dependent shor-term reliability models of transmission equipment [J]. Proceedings of the CSEE, 2009, 29(7): 39-46. [12] 李晶,王素华. 计及气候条件含风力发电电力系统可靠性分析[J]. 电力系统及其自动化学报,2012,24(5):67-70. LI Jing, WANG Su-hua. Reliability of power system containing wind farms in consideration of climate conditions[J]. Proceedings of the CSU-EPSA, 2012, 24(5): 67-70. [13] 孙京锋,周步祥,林楠,等. 气候多变型区域配电系统可靠性预测[J]. 电力系统及其自动化学报,2012,24(2):124-127. SUN Jing-feng, ZHOU Bu-xiang, LI Nan, et al . Reliability prediction of distribution system in weather-changeable regions[J]. Proceedings of the CSU-EPSA, 2012, 24(2): 124-127. [14] 宋嘉婧,郭创新,张金江,等. 山火条件下的架空输电线路停运概率模型[J]. 电网技术,2013,37(1):100-105. SONG Jia-jing, GUO Chuang-xin, ZHANG Jin-jiang, et al . A probabilistic model of overhead transmission line outage due to forest fire [J]. Power System Technology, 2013, 37(1): 100-105. [15] 黄旭. 含异步化同步发电机的电网可靠性评估模型研究[D]. 重庆:重庆大学,2012. HUANG Xu. Research on power grid reliability evaluation model incorporating asynchronized generators[D]. Chongqing: Chongqing University, 2012. [16] 陶松梅,陈碧云,苏星华. 考虑联合循环机组的发输电系统可靠性评估[J]. 现代电力,2012,29(4):17-21. TAO Song-mei, CHEN Bi-yun, SU Xing-hua. Reliability assessment of generation and transmission system with combined cycle units [J]. Modern Electric Power, 2012, 29(4): 17-21. [17] 赵渊,黄旭,谢开贵. 计及异步化同步发电机的电网可靠性评估模型[J]. 电力系统自动化,2011,35(19):6-11. ZHAO Yuan, HUANG Xu, XIE Kai-gui. A reliability evaluation model for power systems incorporating asynchronized generators[J]. Automation of Electric Power Systems, 2011, 35(19): 6-11. [18] 郑传材,管霖. 基于子系统划分的直流输电系统可靠性模型[J]. 中国电力,2010,43(2):21-25. ZHENG Chuan-cai, GUAN Lin. Research on reliability model of HVDC based on subsystems division [J]. Electric Power, 2010, 43(2): 21-25. [19] 武宏波,胡静. 改进模糊运算方法及在电力系统风险评估的应用[J]. 中国电力,2012,45(5):52-56. WU Hong-bo, HU Jing. An improved fuzzy algorithm and its application in power system risk assessment[J]. Electric Power,2012, 45(5): 52-56. [20] ZADKHAST S, FOTUHI-FIRUZABAD M, AMINIFAR F, et al .Reliability evaluation of an HVDC transmission system tapped by a VSC station [J]. IEEE Transactions on Power Delivery, 2010, 25(3): 1962-1970. [21] 张静伟,任震,黄雯莹. 直流系统可靠性故障树评估模型及应用[J]. 电力自动化设备,2005,25(6):62-65. ZHANG Jing-wei, REN Zhen, HUANG Wen-ying. FTA models and its application in HVDC system evaluation[J]. Electric Power Automation Equipment, 2005, 25(6): 62-65. [22] 周家启,陈炜骏,谢开贵,等. 高压直流输电系统可靠性灵敏度分析模型[J]. 电网技术,2007,31(19):18-23. ZHOU Jia-qi, CHEN Wei-jun, XIE Kai-gui, et al . A sensitivity analysis model of HVDC transmission system reliability evaluation [J]. Power System Technology, 2007, 31(19): 18-23. [23] 刘海涛,程林,孙元章,等. 交直流系统可靠性评估[J]. 电网技术,2004,28(23):27-31. LIU Hai-tao, CHENG Lin, SUN Yuan-zhang, et al . Reliability evaluation of hybrid AC/DC power systems[J]. Power System Technology, 2004, 28(23): 27-31. [24] 张雪松,王超,常勇,等. GO法在特高压直流输电可靠性研究中的应用[J]. 高电压技术,2009,35(2):236-241. ZHANG Xue-song, WANG Chao, CHANG Yong, et al . Reliability analysis of UHVDC system by the GO methodology[J]. High Voltage Engineering, 2009, 35(2): 236-241. [25] 梅念,陈东,马为民,等. 基于扩展GO法的HVDC保护系统可靠性评估[J]. 电网技术,2013,37(4):1069-1073. MEI Nian, CHEN Dong, MA Wei-min, et al . Reliability assessment of protections for HVDC transmission system based on extended goal-oriented method[J]. Power System Technology,2013, 37(4): 1069-1073. [26] 龚剑波,黄民翔,徐国丰. 基于改进GO法的1 000 kV电气主接线可靠性研究[J]. 机电工程,2012,29(2):215-219. GONG Jian-bo, HUANG Min-xiang, XU Guo-feng. Reliability research of 1 000 kV main electrical connections based on improved GO methodology[J]. Journal of Mechanical & Electrical Engineering, 2012, 29(2): 215-219. [27] 汤广福,贺之渊,滕乐天,等. 电压源换流器高压直流输电技术最新研究进展[J]. 电网技术,2008,32(22):39-44. TANG Guang-fu, HE Zhi-yuan, TENG Le-tian, et al . New progress on HVDC technology based on voltage source converter[J]. Power System Technology, 2008, 32(22): 39-44. [28] MACLEOD N M, BARKER C D, KIRBY N M. Connection of renewable energy sources through grid constraint points using HVDC power transmission systems[C]//IEEE PES General Meeting. New Orleans: IEEE PES, 2010: 1-7. [29] 程晓绚,林周宏,刘崇茹,等. MMC子模块中IGBT等效模型的仿真验证[J]. 中国电力,2013,46(7):53-57. CHENG Xiao-xuan, LIN Zhou-hong, LIU Chong-ru, et al . Simulation of IGBT equivalent model in MMC submodule[J].Electric Power, 2013, 46(7): 53-57. [30] 孙宇斌,刘文霞,裘剑明,等. 计及备用元件的柔性直流输电系统可靠性评估方法[J]. 现代电力,2013,30(1):8-12. SUN Yu-bin, LIU Wen-xia, QIU Jian-ming, et al . The reliability evaluation method for VSC-HVDC system by considering of standby components [J]. Modern Electric Power, 2013, 30(1): 8-12. [31] 汪隆君,王钢,李博. 交直流混联输电系统充裕度评估的最优负荷削减模型[J]. 电力系统自动化,2011,35(7):7-12. WANG Long-jun, WANG Gang, LI Bo. An optimal load shedding model for AC/DC hybrid transmission system adequacy assessment [J]. Automation of Electric Power Systems, 2011, 35(7): 7-12. [32] 谢国辉,李琼慧,王卿然. 风电容量充裕性成本分析模型和方法研究[J]. 中国电力,2012,45(10):86-89. XIE Guo-hui, LI Qiong-hui, WANG Qing-ran. Study on analysis model and method of wind power adequacy capacity cost[J].Electric Power, 2012, 45(10): 86-89. [33] 秦睿,董开松,李臻,等. 风电场地形对风电机组特性影响的检测评估系统[J]. 中国电力,2012,45(11):78-81. QIN Rui, DONG Kai-song, LI Zhen, et al . Evaluation system for the impact of wind farm terrains on the performance of wind turbine generators [J]. Electric Power, 2012, 45(11): 78-81. [34] 李洪涛.人工神经网络和模糊技术在风能预测中的应用[J]. 中国电力,2012,45(8):69-73. LI Hong-tao. Application of artificial neural network and fuzzy logic on wind power forecast [J]. Electric Power, 2012, 45(8): 69-73. [35] 李元诚,杨瑞仙. 用于短期风速预测的优化核心向量回归模型[J]. 中国电力,2012,45(3):68-71. LI Yuan-cheng, YANG Rui-xian. An optimized CVR model for short-term wind speed forecasting [J]. Electric Power, 2012, 45(3): 68-71. [36] 李洪涛,马志勇,芮晓明. 基于数值天气预报的风能预测系统[J]. 中国电力,2012,45(2):64-68. LI Hong-tao, MA Zhi-yong, RUI Xiao-ming. Forecasting system based on numerical weather prediction[J]. Electric Power, 2012, 45(2): 64-68. [37] BILLINTON R, CHEN Hua, GHAJAR R. A sequential simulation technique for adequacy evaluation of generating systems including wind energy[J]. IEEE Transactions on Energy Conversion, 1996, 11(4): 728-734. [38] 石文辉,陈静,王伟胜. 含风电场的互联发电系统可靠性评估[J]. 电网技术,2012,36(2):224-230. SHI Wen-hui, CHEN Jing, WANG Wei-sheng. Reliability assessment of interconnected generation systems with grid- connected wind farms [J]. Power System Technology, 2012, 36(2):224-230. [39] SPERA D A. Wind turbine technology fundamental concepts of wind turbine engineering [M]. NewYork: ASME, 1994: 313-315. [40] 曾利华,王丰,刘德有. 风电场风机尾流及其迭加模型的研究[J]. 中国电机工程学报,2011,31(19):37-42. ZENG Li-hua, WANG Feng, LIU De-you. Research on wind turbine wake model and over lappingg in wind farm[J].Proceedings of the CSEE, 2011, 31(19): 37-42. [41] WANGDEE W, BILLINTON R. Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment [J]. IEEE Transactions on Energy Conversion, 2006, 21(3): 734-741. [42] 李玉敦,谢开贵,胡博. 基于Copula 函数的多维时序风速相依模型及其在可靠性评估中的应用[J]. 电网技术,2013,37(3):840-846. LI Yu-dun, XIE Kai-gui, HU Bo. A copula function-based dependent model for multivariate wind speed time series and its application in reliability assessment [J]. Power System Technology, 2013, 37(3): 840-846. [43] 陈树勇,戴慧珠,白晓民,等. 风电场的发电可靠性模型及其应用[J]. 中国电机工程学报,2000,20(3):26-29. CHEN Shu-yong, DAI Hui-zhu, BAI Xiao-min, et al . Reliability model of wind power plants and its application [J]. Proceedings of the CSEE, 2000, 20(3): 26-29. [44] 王海超,鲁宗相,周双喜. 风电场发电容量可信度研究[J]. 中国电机工程学报,2005,25(10):103-106. WANG Hai-chao, LU Zong-xiang, ZHOU Shuang-xi. Research on the capacity of wind energy resources[J]. Proceedings of the CSEE, 2005, 25(10): 103-106. [45] HU P, KARKI R, BILLINTON R. Reliability evaluation of generating systems containing wind power and energy storage[J].IET Generation, Transmission and Distribution, 2009, 3(8): 783-791. [46] CUI J T, LI K J, SUN Y, et al . Distributed energy storage system in wind power generation[C]//2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), 2011: 1535-1540. [47] BARTON J P, INFIELD D G. Energy storage and its use with intermittent renewable energy[J]. IEEE Trans on Energy Conversion, 2004, 19(2): 441-448. [48] 王振华,朱桂萍. 并网状态下微电网中微电源出力优化算法[J]. 中国电力,2012,45(1):55-58,77. WANG Zhen-hua, ZHU Gui-ping. Optimization of micro-source output of a grid-connected micro-grid [J]. Electric Power, 2012, 45(1): 55-58, 77. [49] BILLINTON R, BAGEN, YU Cui. Reliability evaluation of small stand-alone wind energy conversion systems using a time series simulation model[J]. IEEE Proceedings Generation, Transmission and Distribution, 2003, 150(1): 96-100. [50] 王剑,刘天琪,李兴源. 风电场及储能装置对发输电系统可靠性的影响[J]. 电网技术,2011,35(5):165-170. WANG Jian, LIU Tian-qi, LI Xing-yuan. Influences of connecting wind farms and energy storage devices to power grid on reliability of power generation and transmission system[J]. Power System Technology, 2011, 35(5): 165-170. [51] 谢开贵,王岸,胡博. 计及储能设备运行策略的风/柴/储混合系统可靠性评估[J]. 电力系统保护与控制,2012,40(9):1-7. XIE Kai-gui, WANG An, HU Bo. Reliability evaluation of wind- diesel-storage hybrid system considering energy storage system operating strategies[J]. Power System Protection and Control, 2012, 40(9): 1-7. [52] GIORSETTO P, UTSUROGI K F. Development of a new procedure for reliability modeling of wind turbine generators[J].IEEE Transactions on Power Apparatus and System, 1982, 102(1): 134-143. [53] BILLINTON R, GAN L. Wind power modeling and application in generating adequacy assessment[C]//Proceedings of IEEE WESCANEX 93 Communication,Computers and Power in the Modern Environment, Saskatoon (Canada): 1993, 100-106. [54] 雷虹云,郑超,汪宁渤,等. 基于变频器受控源模拟的双馈风机等效仿真[J]. 中国电力,2012,45(6):82-86. LEI Hong-yun, ZHENG Chao, WANG Ning-bo, et al . Equivalent simulation of doubly-fed induction generators based on controlled source models of converters [J]. Electric Power, 2012, 45(6): 82-86. [54] 吴林伟,张建华,刘若溪. 考虑风电机组故障的风电场可靠性模型及其应用[J]. 电力系统自动化,2012,36(16):31-35. WU Lin-wei, ZHANG Jian-hua, LIU Ruo-xi. A wind farm reliability model considering wind turbine faults and its application [J]. Automation of Electric Power Systems, 2012, 36(16): 31-35. [55] 王华昕,赵永熹. 基于主模比的FACTS阻尼控制器广域信号选取方法[J]. 中国电力,2013,46(7):61-63,70. WANG Hua-xin, ZHAO Yong-xi. Selecting Method of FACTS damping controller wide area control signals based on dominant mode ratio [J]. Electric Power, 2013, 46(7): 61-63, 70. [56] BAGHAEE H R, JANNATI M, VAHIDI B, et al . Optimal multi- type FACTS allocation using genetic algorithm to improve power system[C]//Proceedings of 12th International Middle-East Power System Conference, March 12-15, 2008, Aswan, Egypt: 162-166. [57] 赵渊,周念成,谢开贵. 计及FACTS元件的发输电系统可靠性评估模型[J]. 重庆大学学报:自然科学版,2006,29(5):19-23. ZHAO Yuan, ZHOU Nian-cheng, XIE Kai-gui. Reliability evaluation model of composite generation and transmission system incorporating FACTS devices[J]. Journal of Chongqing University: Natural Science Edition, 2006, 29(5): 19-23. [58] FOTUHI-FIRUZABAD M, BILLINTON R, FARIED S O, et al .Power system reliability enhancement using unified power flow controllers[C]//Proceedings of International Conference on Power System Technology, Power Con 2000: 745-750. [59] AMINIFAR F, FOTUHI-FIRUZABAD M, BILLINTON R.Extended reliability model of a unified power flow controller[J].IET Generation, Transmission & Distribution, 2007, 1(6): 896-903. [60] GREEN R C, WANG Ling-feng, ALAM M, et al . Evaluating the impact of plug-in hybrid electric vehicles on composite power system reliability[C]//North American Power Symposium. Boston,USA: IEEE, 2011: 1-7. |