[1] 裴哲义,范高锋. 中国风电运行消纳相关问题研究[J]. 中国电力,2014,47(4):1-4. PEI Zhe-yi, FAN Gao-feng. Research on wind power operation and accommodation problems in China[J]. Electric Power, 2014, 47(4): 1-4. [2] 国家能源局.关于做好2013年风电并网和消纳相关工作的通知[Z]. 2013 [3] 中国电力企业联合会. 2012年电力工业统计快报[R]. 2013. [4] 尹明,葛旭波,王成山,等. 我国风电大规模开发相关问题探讨[J]. 中国电力,2010,43(3):59-62. YIN Ming, GE Xu-bo, WANG Cheng-shan, et al . Analysis of issues about China’s large-scale wind power development[J].Electric Power, 2010, 43(3): 59-62. [5] 王彩霞,李琼慧,谢国辉. 风电供热提高低谷风电消纳能力评估[J]. 中国电力,2013,46(12):100-106. WANG Cai-xia, LI Qiong-hui, XIE Guo-hui. Evaluation of wind power heating in facilitating wind power integration capability during valley load period [J]. Electric Power, 2013, 46(12): 100-106. [6] 郭飞,王智冬,王帅,等. 我国风电消纳现状及输送方式[J]. 电力建设,2014,35(2):18-22. GUO Fei, WANG Zhi-dong, WANG Shuai, et al . Consumption situation and transmission modes of wind power in China[J]. Electric Power Construction, 2014, 35(2): 18-22. [7] 刘德伟,黄越辉,王伟胜,等. 考虑调峰和电网输送约束的省级系统风电消纳能力分析[J]. 电力系统自动化,2011,35(22):77-81. LIU De-wei, HUANG Yue-hui, WANG Wei-sheng, et al . Analysis on provincial system available capability of accommodating wind power considering peak load dispatch and transmission constraints [J]. Automation of Electric Power Systems, 2011, 35(22): 78-81. [8] 凡鹏飞,张粒子,谢国辉. 充裕性资源协同参与系统调节的风电消纳能力分析模型[J]. 电网技术,2012,36(5):23-26. FAN Peng-fei, ZHANG Li-zi, XIE Guo-hui. Analysis model for accommodation capability of wind power with adequacy resources involved in system regulation [J]. Power System Technology, 2012, 36(5): 23-26. |