[1] 丁广鑫.智能变电站建设技术[M].北京:中国电力出版社,2011. [2] 国家电网公司.智能变电站技术导则[S]. 北京:中国电力出版社,2009. [3] 杨方,王文迪,葛旭波,等. 我国智能电网发展格局及综合评价[J]. 中国电力,2012,45(12):81-85. YANG Fang, WANG Wen-di, GE Xu-bo, et al . Comprehensive assessment on development patterns of smart grid in China[J].Electric Power, 2012, 45(12): 81-85. [4] 钱玉春,袁敬中,赵琳.唐山郭家屯220 kV智能变电站建设及应用[J]. 电力系统自动化,2009,33(24):24-27. QIAN Yu-chun, YUAN Jing-zhong, ZHAO Lin. The application of smart substation automation system in Tangshan Guojiatun 220 kV project[J]. Automation of Electric Power Systems, 2009, 33(24): 24-27. [5] 高冬学,智全中,朱立军,等. 智能变电站保护配置方案研究[J]. 电力系统保护与控制,2012,40(1):68-71. GAO Dong-xue, ZHI Quan-zhong, ZHU Li-jun, et al . Configuration project of protect unit according to levels for smart substation[J]. Power System Protection and Control, 2012, 40(1): 68-71. [6] 吴国啺,王庆平,李刚.基于数字化的变电站集中式保护研究[J]. 电力系统保护与控制,2009,37(10):15-18. WU Guo-yang, WANG Qing-ping, LI Gang. Study of centralized protection based on digital substation[J]. Power System Protection and Control, 2009, 37(10): 15-18. [7] 孔晓峰,杜浩良. 基于IEC61850标准的数字化继电保护运行方式[J]. 中国电力,2010,43(4):28-32. KONG Xiao-feng, DU Hao-liang. Operating mode of digital relay protection based on IEC 61850[J]. Electric Power, 2010, 43(4):28-32. [8] 韩本帅,孙中尉,崔海鹏,等.智能变电站过程层时间同步方式研究[J]. 中国电力,2012,45(11):86-90. HAN Ben-shuai, SUN Zhong-wei, CUI Hai-peng, et al . Research on time synchronization mode in process level of smart substation[J]. Electric Power, 2012, 45(11): 86-90. [9] DL/T 281—2012 合并单元测试规范[S]. 2012. |