[1] 熊惠敏,房鑫炎,郁惟镛,等. 电力系统全网停电后的恢复——黑起动综述[J]. 电力系统及其自动化学报,1999,11(3):12-17. XIONG Hui-min, FANG Xin-yan, YU Wei-yong, et al . The summary of black start restoration of electrical power system after blackout[J]. Proceedings of the EPSA, 1999,11(3):12-17. [2] 顾雪平,赵书强,刘艳,等. 一个实用的电力系统黑启动决策支持系统[J]. 电网技术,2004,28(9):54-57. GU Xue-ping, ZHAO Shu-qiang, LIU Yan, et al . A practical decision support system for power system black start[J]. Power System Technology, 2004,28(9):54-57. [3] 孟宪朋,么莉,林济铿. 基于关联矩阵法的电网黑启动方案评估[J].电工电能新技术,2007,26(4):65-70. MENG Xian-peng, YAO Li, LIN Ji-keng. Assessment of black start schemes for power grid based on relational matrix analysis[J]. Advanced Technology of Electrical Engineering and Energy,2007,26(4):65-70. [4] 李秀卿,尚景刚,姜世金. 基于模糊区间数的黑启动方案评估层次分析法[J]. 电工电能新技术,2010,19(2):57-61. LI Xiu-qing, SHANG Jing-gang, JIANG Shi-jin. Fuzzy interval number based hierarchical analysis process for assessing black- start plans[J]. Advanced Technology of Electrical Engineering and Energy,2010,19(2):57-61. [5] 钟慧荣,顾雪平. 基于模糊层次分析法的黑启动方案评估及灵敏度分析[J]. 电力系统自动化,2010,34(16):34-37,49. ZHONG Hui-rong, GU Xue-ping. Assessment of power system black-start schemes based on fuzzy analytic hierarchy process and its sensitivity analysis[J]. Automation of Electric Power Systems, 2010,34(16):34-37,49. [6] 林济铿,李童飞,赵子明,等. 基于熵权模糊综合评价模型的电力系统黑启动方案评估[J]. 电网技术,2012,36(2):115-120. LIN Ji-keng, LI Tong-fei, ZHAO Zi-ming, et al . Assessment on power system black-start schemes based on entropy-weighted fuzzy comprehensive evaluation model[J]. Power System Technology, 2012,36(2):115-120. [7] 刘艳,顾雪平,张丹. 基于数据包络分析模型的电力系统黑启动方案相对有效性评估[J].中国电机工程学报,2006,26(5):32-37,94. LIU Yan, GU Xue-ping, ZHANG Dan. Data envelopment analysis based relative effectiveness assessment of power system black- start plans[J]. Proceedings of the CSEE, 2006,26(5):32-37,94. [8] 刘艳,顾雪平.评估黑启动方案的层次化数据包络分析方法[J].电力系统自动化,2006,30(21):33-38. LIU Yan, GU Xue-ping. Hierarchical data envelopment analysis for assessing black-start plans[J]. Automation of Electric Power Systems, 2006,30(21):33-38. [9] 林济铿,蒋越梅,岳顺民,等. 基于DEA/AHP 模型的电力系统黑启动有效方案评估[J]. 电力系统自动化,2007,31(15):65-69. LIN Ji-keng, JIANG Yue-mei, YUE Shun-min, et al . Assessment of effective schemes for power system black-start based on DEA/AHP[J]. Automation of Electric Power Systems,2007,31(15):65-69. [10] 吴涛,郭嘉阳,李华伟.华北电网利用十三陵抽水蓄能电厂水电机组进行黑启动的试验研究[J].电网技术,2001,25(3):56-58.WU Tao, GUO Jia-yang, LI Hua-wei. Investigation of black start for North China power system by Shisanling hydroelectric generating sets[J]. Power System Technology, 2001,25(3):56-58. [11] 向丽玲,曹亚龙,王珂.广州电网黑启动方案[J].中国电力,2011,44(5):15-18. XIANG Li-ling, CAO Ya-long, WANG Ke. Black start scheme of Guangzhou power grid[J]. Electric Power,2011,44(5):15-18. [12] 刘艳. 电力系统黑启动恢复及其决策支持系统的研究[D]. 保定:华北电力大学,2007. [13] 罗萍萍,林济铿,李丁. 电力系统黑启动初始方案搜索算法[J].中国电力,2011,44(5):19-25. LUO Ping-ping, LIN Ji-keng, LI Ding. Search algorithm of black start initial scheme[J]. Electric Power, 2011,44(5):19-25. [14] 吴烨. 城市电网黑启动预案研究与优化评估[D]. 上海:上海交通大学,2009. [15] 刘英平,林志贵,沈祖诒. 基于改进的数据包络分析模型的绿色产品评价研究[J]. 中国机械工程,2005,16(20):1809-1813. LIU Ying-ping, LIN Zhi-gui, SHEN Zu-yi. Study on green product evaluation based on modified data envelopment analysis model[J]. China Mechanical Engineering, 2005,16(20):1809-1813. |