[1] 李明节. 基于国际先进技术的风电调度研究与实践[J]. 中国电力,2012,45(11):1-6. LI Ming-jie. Research and practice of wind power dispatch based on international advanced experience[J]. Electric Power, 2012, 45(11): 1-6. [2] 路路,郭秀锐. 电力行业低碳减排对策的研究进展[J]. 环境科学与技术,2009,33(12F):355-359. LU Lu, GUO Xiu-rui. Research progress on low carbon emission mitigation options of power sectors[J]. Environmental Science & Technology, 2009, 33(12F): 355-359. [3] 迟远英. 基于低碳经济视角的中国风电产业发展研究[D]. 长春:吉林大学,2008. [4] 白建华,张钦,辛颂旭,等. 风电利用水平评价关键指标研究[J]. 中国电力,2012,45(11):7-12. BAI Jian-hua, ZHANG Qin, XIN Song-xu, et al . Research on key indexes comparison of wind power utilization level[J]. Electric Power, 2012, 45(11): 7-12. [5] 周双喜,王海超,陈寿孙. 风力发电运行价值分析[J]. 电网技术,2006,30(14):98-102. ZHOU Shuang-xi, WANG Hai-chao, CHEN Shou-sun. Analysis on operation value of wind power resources[J]. Power System Technology, 2006, 30(14): 98-102. [6] 王海超,鲁宗相,周双喜. 风电场发电容量可信度研究[J]. 中国电机工程学报,2005,25(10):103-106. WANG Hai-chao, LU Zong-xiang, ZHOU Shuang-xi. Research on the capacity credit of wind energy resources[J]. Proceedings of the CSEE, 2005, 25(10): 103-106. [7] MATILAINEN J, HAARLA L, NIELSEN H K. 112-Estimation of capacity credit in Finland——Different methods for different use[C]//2009 CIGRE/IEEE PES joint symposium integration of wide-scale renewable resources into the power delivery system. Calgary, Canada, 2009. [8] MILLIGAN M, PORTER K. Determining the capacity value of wind: A survey of methods and implementation [M]. Golden, Colo USA: National Renewable Energy Laboratory, 2005. [9] 黄杰鹏,李宇红,倪维斗. 并网风电场可避免费用的计算[J]. 电网技术,2006,30(16):50-53. HUANG Jie-peng, LI Yu-hong, NI Wei-dou. Avoidable cost of wind farm interconnected to power grid[J]. Power System Technology, 2006, 30(16): 50-53. [10] 王丹,孙昶辉. 风电场发电量计算的物理模型[J]. 中国电力,2011,44(1):94-97. WANG Dan, SUN Chang-hui. Annual energy production calculation in wind farm based on physical model [J]. Electric Power, 2011, 44(1): 94-97. [11] 王正明,路正南. 风电项目投资及其运行的经济性分析[J]. 可再生能源,2008,26(6):21-24. WANG Zheng-ming, LU Zheng-nan. The economic analysis on the investment and operation of the wind power project [J]. Power Energy Resources, 2008, 26(6): 21-24. [12] 李现忠,蔡兴国,付春梅. 碳交易机制下考虑节能减排的竞价交易模式[J]. 电力系统自动化,2011,35(10):48-52. LI Xian-zhong, CAI Xing-guo, FU Chun-mei. An energy saving and emission reduction based bidding transaction mode under carbon trading mechanism[J]. Automation of Electric Power Systems, 2011, 35(10): 48-52. [13] 王锡凡. 电力系统规划基础[M]. 北京:中国电力出版社,1994. [14] 王锡凡,王秀丽. 随机生产模拟及其应用[J]. 电力系统自动化,2003,27(8):10-15. WANG Xi-fan, WANG Xiu-li. Probabilistic production simulation method and its application[J]. Automation of Electric Power Systems, 2003, 27(8): 10-15. [15] 张节潭,程浩忠,胡泽春,等. 含风电场的电力系统随机生产模拟[J]. 中国电机工程学报,2009,29(28):34-39. ZHANG Jie-tan, CHENG Hao-zhong, HU Ze-chun, et al . Power system probabilistic production simulation including wind farms [J]. Proceedings of the CSEE, 2009, 29(28): 34-39. [16] GRIGG C, WONG P, ALBRECHT P, et al . The IEEE reliability test system-1996[J]. IEEE Transactions on Power Systems,1999, 14(3): 1010-1020. |