[1] 王相勤. 当前我国电动汽车发展的瓶颈问题及对策[J]. 能源技术经济,2011,23(3):1-5. WANG Xiang-qin. Existing bottleneck problems and countermeasures in China’s electric vehicle development[J]. Energy Technology and Economics, 2011, 23(3): 1-5. [2] 杨健,王媚,张屹,等. 电动汽车动力电池参与电网调峰的应用[J]. 华东电力,2010,38(11):1685-1687. YANG Jian, WANG Mei, ZHANG Yi, et al . Applying power battery of electric vehicles for regulating peak in grid[J]. East China Electric Power, 2010, 38(11): 1685-1687. [3] GUILLE C, GROSS G. A conceptual framework for the vehicle- to-grid(V2G) implementation[J]. Energy Policy, 2009, 37(11): 4379-4390. [4] KEMPTON W, JASNA T. Vehicle-to-grid implementation: from stabilizing the grid to supporting large-scale renewable energy [J]. Journal of Power Source, 2005, 144(1): 280-294. [5] 刘振华,陈磊,闵勇. 含风电的节能发电调度实用化模型[J]. 中国电力,2011,44(6):52-57. LIU Zhen-hua, CHEN Lei, MIN Yong. A practical energy-saving generation dispatching model integrated with wind power[J]. Electric Power, 2011, 44(6): 52-57. [6] 陈海焱,陈金富,段献忠. 含风电场的电力系统经济调度的模糊建模及优化算法[J]. 电力系统自动化,2006,30(2):22-26. CHEN Hai-yan, CHEN Jin-fu, DUAN Xian-zhong. Fuzzy modeling and optimization algorithm on dynamic economic dispatch in wind power integrated system[J]. Automation of Electric Power Systems, 2006, 30(2): 22-26. [7] 姜文,严正. 基于一种改进粒子群算法的含风电场电力系统动态经济调度[J]. 电力系统保护与控制,2010,38(21):173-183. JIANG Wen, YAN Zheng. Dynamic economic dispatch considering wind power penetration based on IPSO[J]. Power System Protection and Control, 2010, 38(21): 173-183. [8] 郭晓蕊,王德意,杨国清,等. 基于改进粒子群优化算法的风电场最大接入容量计算[J]. 中国电力,2011,44(1):86-89. GUO Xiao-rui, WANG De-yi, YANG Guo-qing, et al . Maximum injection power calculation based on enhanced particle swarm optimization [J]. Electric Power, 2011, 44(1): 86-89. [9] 黎静华,韦化. 求解机组组合问题的领域搜索法[J]. 中国电机工程学报,2008,28(13):33-40. LI Jing-hua, WEI Hua. Unit commitment via local search point method [J]. Proceedings of the CSEE, 2008, 28(13): 33-40. [10] GAO Ya-jing, ZHAO Kai-xuan, WANG Chen. Economic dispatch containing wind power and electric vehicle battery swap station[C]//2012 IEEE PES T&D Conference and Exhibition. Orlando Flo, USA, 2012: 7-10. [11] 范高锋,裴哲义,辛耀中. 风电功率预测的发展现状与展望[J].中国电力,2011,44(6):38-41. FAN Gao-feng, PEI Zhe-yi, XIN Yao-zhong. Wind power prediction achievement and prospect [J]. Electric Power, 2011, 44(6): 38-41. [12] 栗然,王粤,肖进永. 基于经验模式分解的风电场短期风速预测模型[J]. 中国电力,2009,42(9):77-81. LI Ran, WANG Yue, XIAO Jin-yong. Short-term wind speed forecasting for wind farms based on empirical mode decomposition model [J]. Electric Power, 2009, 42(9): 77-81. [13] 杨秀媛,肖洋,陈树勇. 风电场风速和发电功率预测研究[J]. 中国电机工程学报,2005,25(11):1-5. YANG Xiu-yuan, XIAO Yang, CHEN Shu-yong. Wind speed forecast model for wind farms based on time series analysis[J]. Proceedings of the CSEE, 2005, 25(11): 1-5. |