[1] 康重庆, 姚良忠. 高比例可再生能源电力系统的关键科学问题与理论研究框架[J]. 电力系统自动化, 2017, 41(9):2-11 KANG Chongqing, YAO Liangzhong. Key scientific issues and theoretical research framework for power systems with high proportion of renewable energy[J]. Automation of Electric Power Systems, 2017, 41(9):2-11 [2] 王魁, 张步涵, 闫大威, 等. 含大规模风电的电力系统多时间尺度滚动协调调度方法研究[J]. 电网技术, 2014, 38(9):2434-2440 WANG Kui, ZHANG Buhan, YAN Dawei, et al. A multi-time scale rolling coordination scheduling method for power grid integrated with large scale wind farm[J]. Power System Technology, 2014, 38(9):2434-2440 [3] 刘纯, 曹阳, 黄越辉, 等. 基于时序仿真的风电年度计划制定方法[J]. 电力系统自动化, 2014, 38(11):13-19 LIU Chun, CAO Yang, HUANG Yuehui, et al. An annual wind power planning method based on time sequential simulations[J]. Automation of Electric Power Systems, 2014, 38(11):13-19 [4] 王漪, 于继来, 柳焯. 基于月度竞价空间滚动均衡化的年中标电量分解[J]. 电力系统自动化, 2006, 30(17):24-27 WANG Yi, YU Jilai, LIU Zhuo. Decomposition of yearly bided volume based on roll-uniformization of monthly competitive bidding spaces[J]. Automation of Electric Power Systems, 2006, 30(17):24-27 [5] 杨莉, 王乔来, 胡朝阳. 考虑公平及满意度的合同电量分解算法[J]. 电力系统保护与控制, 2012, 40(19):30-35 YANG Li, WANG Qiaolai, HU Zhaoyang. Energy contract decomposition considering equity and satisfaction[J]. Power System Protection and Control, 2012, 40(19):30-35 [6] 陈建华, 杨莉, 张宁, 等. 基于发电商申报的差价合同电量分解[J]. 电力系统自动化, 2009, 33(3):30-34 CHEN Jianhua, YANG Li, ZHANG Ning, et al. Decomposition of contract for difference based on generation companies declaration[J]. Automation of Electric Power Systems, 2009, 33(3):30-34 [7] 陈建华, 张宁, 戴铁潮, 等. 确定性电量分解算法实证分析[J]. 电力系统自动化, 2008, 32(2):21-25 CHEN Jianhua, ZHANG Ning, DAI Tiechao, et al. Empirical analysis on the deterministic contract decomposition algorithm[J]. Automation of Electric Power Systems, 2008, 32(2):21-25 [8] 王冠群, 刘锋, 梅生伟, 等. 合同电量优化分解模型及算法[J]. 电机与控制学报, 2012, 16(7):58-64 WANG Guanqun, LIU Feng, MEI Shengwei, et al. Optimization model and algorithm for contract energy decomposition[J]. Electric Machines and Control, 2012, 16(7):58-64 [9] 张少迪. 基于CSS的年度合约电量分解方法[J]. 电力自动化设备, 2014, 34(11):135-141 ZHANG Shaodi. Annual contract power decomposition method based on CSS[J]. Electric Power Automation Equipment, 2014, 34(11):135-141 [10] 王良缘. 基于粒子群优化的年度合同电量降维分解模型[J]. 电网与清洁能源, 2017, 33(11):63-69 WANG Liangyuan. Dimensionality reduction model of annual contract electricity based on particle swarm optimization[J]. Power System and Clean Energy, 2017, 33(11):63-69 [11] 王漪, 汤伟, 罗桓桓, 等. 编制直调火力发电单元月度电能交易计划的负荷率偏差法[J]. 电力系统保护与控制, 2009, 37(22):134-140 WANG Yi, TANG Wei, LUO Huanhuan, et al. Load ratio deflection method for making monthly trade schedule of directly dispatched thermal power generation units[J]. Power System Protection and Control, 2009, 37(22):134-140 [12] 汤伟, 王漪, 于峰, 等. 编制直调火力发电单元月度电能交易计划的综合成本加权法[J]. 电网技术, 2009, 33(17):167-173 TANG Wei, WANG Yi, YU Feng, et al. An integrative cost weighted method for drawing up electric energy monthly transaction schedule of directly dispatched thermal power generation units[J]. Power System Technology, 2009, 33(17):167-173 [13] 颜伟, 李翔, 梁文举, 等. 基于负荷分段技术的多目标度发电计划及其遗传算法[J]. 电力自动化设备, 2013, 33(10):47-52 YAN Wei, LI Xiang, LIANG Wenju, et al. Multi-objective monthly generation scheduling based on load partition technology and its genetic algorithm[J]. Electric Power Automation Equipment, 2013, 33(10):47-52 [14] 梁志飞, 夏清, 许洪强, 等. 基于多目标优化模型的省级电网月度发电计划[J]. 电网技术, 2009, 33(13):90-95 LIANG Zhifei, XIA Qing, XU Hongqiang, et al. Monthly generation scheduling method based on multi-objective optimization model for provincial power grid[J]. Power System Technology, 2009, 33(13):90-95 [15] 张传成, 许丹, 戴赛, 等. 基于特征时段提取的月度发电计划与安全校核模型[J]. 电网技术, 2016, 40(11):3342-3347 ZHANG Chuancheng, XU Dan, DAI Sai, et al. Monthly generation scheduling and security correction model based on characteristic time periods[J]. Power System Technology, 2016, 40(11):3342-3347 [16] 施磊, 耿照为, 张晶, 等. 风险适应型的月度发电计划管理模式[J]. 电网技术, 2014, 38(12):3384-3389 SHI Lei, GENG Zhaowei, ZHANG Jing, et al. Risk-adaptable monthly generation scheduling mode[J]. Power System Technology, 2014, 38(12):3384-3389 [17] 李剑楠, 乔颖, 鲁宗相, 等. 多时空尺度风电统计特性评价指标体系及其应用[J]. 中国电机工程学报, 2013, 33(13):53-61 LI Jiannan, QIAO Ying, LU Zongxiang, et al. An evaluation index system for wind power statistical characteristics in multiple spatial and temporal scales and its application[J]. Proceedings of the CSEE, 2013, 33(13):53-61 [18] 王雁凌, 张雪佼, 阎敬民. 基于变权灰云模型的风电场并网技术性综合评价[J]. 电网技术, 2013, 37(12):3546-3551 WANG Yanling, ZHANG Xuejiao, YAN Jingmin. Weight-varying gray cloud model based comprehensive evaluation on technical performance of overall grid-integration of wind farm[J]. Power System Technology, 2013, 37(12):3546-3551 [19] 张文朝, 顾雪平. 应用变异系数法和逼近理想解排序法的风电场综合评价[J]. 电网技术, 2014, 38(10):2741-2746 ZHANG Wenchao, GU Xueping. Comprehensive evaluation of wind farms using variation coefficient method and technique for order preference by similarity to ideal solution[J]. Power System Technology, 2014, 38(10):2741-2746 [20] 卢锦玲, 张津, 丁茂生. 含风电的电力系统调度经济性评价[J]. 电网技术, 2016, 40(8):2258-2264 LU Jinling, ZHANG Jin, DING Maosheng. Economic evaluation of power system dispatch integrated with wind power[J]. Power System Technology, 2016, 40(8):2258-2264 |