[1] 吴烨. 电网黑启动预案研究与优化评估[D]. 上海:上海交通大学,2009. WU Ye. Scheme research and optimal assessment of power grid black-start. Shanghai: Shanghai Jiaotong University, 2009. [2] 丁磊,潘贞存,苏永智,等. 并网分散电源的解列与孤网运行[J]. 电力自动化设备,2007,27(7):25-28. DING Lei, PAN Zhen-cun, SU Yong-zhi, et al . Splitting and islanding of networked dispersed generators[J]. Electric Power Automation Equipment, 2007, 27(7): 25-29. [3] 周云海,闵勇. 恢复控制中的系统重构优化算法研究[J]. 中国电机工程学报,2003,23(4):67-70. ZHOU Yun-hai, MIN Yong. Optimal algorithm for system reconstruction [J]. Proceedings of the CSEE, 2003, 23(4): 67-70. [4] 刘艳,顾雪平,张丹. 基于数据包络分析模型的电力系统黑启动方案相对有效性评估[J]. 中国电机工程学报,2006,26(5):32-37. LIU Yan, GU Xue-ping, ZHANG Dan. Data envelopment analysis based relative effectiveness assessment of power system black-start plans[J]. Proceedings of the CSEE, 2006, 26(5): 32-37. [5] 赵子明,幺莉,林济铿,等. 黑启动辅助决策支持系统[J]. 中国电力,2012,45(5):81-86. ZHAO Zi-ming, YAO Li, LIN Ji-keng, et al . Black-start decision support system [J]. Electric Power, 2012, 45(5): 81-86. [6] 林济铿,蒋越梅,岳顺民,等. 基于DEA/AHP模型的电力系统黑启动有效方案评估[J]. 电力系统自动化,2007,31(15):65-69. LIN Ji-keng, JIANG Yue-mei, YUE Shun-min, et al . Assessment of effective schemes for power system black-start based on DEA/AHP[J]. Automation of Electric Power Systems, 2007, 31(15): 65-69. [7] 沙峰,杨建彪,艾欣,等. 基于改进数据包络分析模型的黑启动方案评估[J]. 中国电力,2013,46(2):50-54. SHA Feng, YANG Jian-biao, AI Xin, et al . Assessment of black start plans based on improved data envelopment analysis model[J]. Electric Power, 2013, 46(2): 50-54. [8] 向丽玲,曹亚龙,王珂,等. 广州电网黑启动方案[J]. 中国电力,2011,44(5):15-18. XIANG Li-ling, CAO Ya-long, WANG Ke, et al . Black start scheme of Guangzhou power grid[J]. Electric Power, 2011, 44(5):15-18. [9] 林振智,文福拴,薛禹胜. 基于多属性群决策特征根法的智能电网黑启动决策[J]. 电力系统自动化,2010,34(5):18-23. LIN Zhen-zhi, WEN Fu-shuan, XUE Yu-sheng, et al . Black-start decision-making in smart grids using multi-attribute group eigenvalue method[J]. Automation of Electric Power Systems,2010, 34(5): 18-23. [10] 曾顺奇,林振智,文福拴,等. 基于Vague集理论的黑启动决策模型与方法[J]. 电力系统自动化,2011,35(2):18-22. ZENG Shun-qi, LIN Zhen-zhi, WEN Fu-shuan, et al . A Vague theory based model and approach for black-start decision-making[J]. Automation of Electric Power Systems, 2011, 35(2): 18-22. [11] 张文修,仇国芳. 基于粗糙集的不确定决策[M]. 北京:清华大学出版社,2005:12-35. [12] PAWLAK Z. Rough sets[J]. International Journal of Computer and Information Sciences, 1982, 11(5): 341-356. [13] 崔广彬,李一军. 基于粗糙熵权的模糊多准则决策方法及应用[J]. 控制与决策,2007,22(4):408-412. CUI Guang-bin, LI Yi-jun. Fuzzy multiple criteria decision- making method and application based on rough entropy weight [J]. Control and Decision, 2007, 22(4): 408-412. [14] 郭嘉阳,吴涛,张仁伟,等. 华北电网“黑启动”试验研究[J]. 华北电力技术,2001(5):3-18. GUO Jia-yang, WU Tao, ZHANG Ren-wei, et al . Test and research of black start in North China power network[J]. North China Electric Power, 2001(5): 3-18. |