中国电力 ›› 2013, Vol. 46 ›› Issue (11): 155-159.DOI: 10.11930/j.issn.1004-9649.2013.11.155.4

• 电力规划 • 上一篇    

新时期中国抽水蓄能电站发展定位及前景展望

程路, 白建华   

  1. 国网能源研究院,北京 100052
  • 收稿日期:2013-09-20 出版日期:2013-11-23 发布日期:2015-12-10
  • 作者简介:程路(1981—),男,湖北随州人,高级工程师,博士,从事能源战略、电力规划、经济评价等相关工作。

Role and Prospect of Pumped Storage Power Stations in China

CHENG Lu, BAI Jian-hua   

  1. State Grid Energy Research Institute, Beijing 100052, China
  • Received:2013-09-20 Online:2013-11-23 Published:2015-12-10

摘要: 论述了中国抽水蓄能发展现状,对抽水蓄能在电力系统中发挥的作用进行了总结。在清洁能源大规模发展、电力输送规模不断扩大的新形势下,探讨了抽水蓄能在不同区域电网中的定位。依据国家相关规划,结合中长期电力增长形势、资源条件、前期进展、发展政策等,对未来20年抽水蓄能的发展前景做出了展望,提出了有关建议。

关键词: 抽水蓄能电站, 发展定位, 前景展望, 规划

Abstract: The current installed capacities of pumped storage power stations and their role in power system are analyzed. Under the new situation that clean energy are developing fast and power transmission scale is constantly expanding, the role of pumped storage power stations in different regional power grids is discussed. According to the related national planning, with consideration of the mid-long term power demand situation, the pumped storage station resources, the prophase works and the development policy, the development prospect of pumped storage stations in the future twenty years in China is predicted.

Key words: pumped storage power station, development role, prospect prediction, planning

中图分类号: