[1] 张礼安,李华启,李刚,等. 建设项目后评价方法和程序[J]. 经济评价,2005,13(11):44-47. ZHANG Li-an, LI Hua-qi, LI Gang, et al . Construction project post evaluation method and program[J]. Economic Review, 2005, 13(11): 44-47. [2] 沈又幸,范艳霞,谢传胜. 基于FAHP法的风电项目后评估研究[J]. 电力需求侧管理,2008,10(6):16-18. SHEN You-xing, FAN Yan-xia, XIE Chuan-sheng. Wind power project post-assessment base on FAHP[J]. Power Demand Side Management, 2008, 10(6): 16-18. [3] 吕太,张连升,李琢,等.层次分析法在风电场运行经济性评价中的应用[J]. 中国电力,2006,39(6):42-44. LV Tai, ZHANG Lian-sheng, LI Zhuo, et al . Application of the analytic hierarchy process to economic performance evaluation of wind farm operation[J]. Electric Power, 2006, 39(6): 42-44. [4] 申洪,王伟胜. 一种评价风电场运行情况的新方法[J]. 中国电机工程学报,2003,23(9):90-93. SHEN Hong, WANG Wei-sheng. A new method for evaluating operation of wind power plant[J]. Proceedings of the CSEE,2003, 23(9): 90-93. [5] 杨永红,李献东. 风电项目后评价理论方法探讨[J]. 华北电力大学学报:社会科学版,2008,(3):6-9. YANG Yong-hong, LI Xian-dong. Study of theory and method for post-evaluating of wind power[J]. Journal of North China Electric Power University: Social Sciences, 2008, (3): 6-9. [6] 李俊峰. 中国可再生能源技术评价[M]. 北京:中国环境科学出版社,1999. [7] 彭怀午,王晓林.风电场设计后评估活动的探讨[J]. 可再生能源,2009,27(4):97-99. PENG Huai-wu, WANG Xiao-lin. Discussion on post evaluation of wind farm design[J]. Renewable Energy Resources, 2009, 27(4): 97-99. [8] 彭怀午,冯长青,刘方锐. 内蒙古某风电场设计后评价[J]. 电网与清洁能源,2009,25(11):66-69. PENG Huai-wu, FENG Chang-qing, LIU Fang-rui. Post-evaluation of the design of a wind farm in inner mongolia[J]. Power System and Clean Energy, 2009, 25(11): 66-69. [9] 杨威.风电场后评估方法研究[D]. 北京:华北电力大学,2010年. [10] 姜广旭. 风电场风能资源与发电量设计后评估研究[D]. 北京:华北电力大学,2009年. |