[1] LEONARDI B, AJJARAPU V. Investigation of various generator reactive power reserve(GRPR) definitions for online voltage stability/security assessment//[C] IEEE PES General Meeting, Jul.2008. [2] 汪宁渤,马彦宏,丁坤,等. 酒泉风电基地脱网事故频发的原因分析[J]. 电力系统自动化,2012,36(19):42-46. WANG Ningbo, MA Yanhong, DING Kun, et al . Analysis on root reasons of WTGS nuisance tripping in Jiuquan wind power base[J]. Automation of Electric Power Systems, 2012, 36(19): 42-46. [3] 毛启静.利用风力发电机的无功功率补偿风电场无功损耗[J].电网技术,2009,33(19):175-180. MAO Qijing. Compensating reactive power loss of wind farm with reactive power generated by wind turbine generators[J]. power system Technology, 2009, 33(19): 175-180. [4] 中国电力企业联合会. GB/T 19963—2011风电场接入电力系统技术规定[S]. 北京:中国标准出版社,2011. [5] 张强,仇卫东. 风电场内集中无功补偿容量的设计与研究[J].中国电力,2012,45(9):25-28. ZHANG Qiang, QIU Weidong. Design of centralized reactive power compensation capacity of the wind farm [J]. Electric Power,2012, 45(9): 25-28. [6] QIN W, WANG P, HAN X, et al . Reactive power aspects in reliability assessment of power systems[J]. IEEE Transactions on Power Systems, 26, 1: 85-92, Feb. 2011. [7] BILLINTON R, KUMAR S. Pertinent factors in the adequacy assessment of a composite generation and transmission system.Transactions of the Engineering and Operating Division of Canadian Electrical Association, 1986, 25(3): 86-141. [8] BILLINTON R, KHAN E, AGARWAT S K. Contingency cut-off criteria in transmission system adequacy assessment. IEE Proceedings:Generation, Transmission and Distribution, 1989, 136(4): 215-221. [9] BILLINTON R, KUMAR S. Effect of higher-level independent generator outages in composite system adequacy evaluation. IEE Proceedings: Generation, Transmission and Distribution, 1987, 134(1): 17-26. [10] 秦文萍,王鹏,韩肖清,等. 电力系统有功和无功功率充裕度评估[J]. 电力系统自动化,2014,38(1):28-33. QIN Wenping, WANG Peng, HAN Xiaoqing, et al . Adequacy evaluation of active and reactive power in power systems[J]. Automation of Electric Power Systems, 2014, 38(1): 28-33. |