[1] 卫银忠,玉宝. 铜接地网在变电所中的应用[J]. 华东电力,2005,33(6):65-68. WEI Yinzhong, NING Yubao. Application of copper ground grid to substations [J]. East China Electric Power, 2005, 33(6): 65-68. [2] 何金良,张波,曾嵘,等. 1 000 kV特高压变电站接地系统的设计[J]. 中国电机工程学报,2009,29(7):7-12. HE Jinliang, ZHANG Bo, ZENG Rong. Grounding system design of 1 000 kV ultra-high voltage substation[J]. Proceedings of the CSEE, 2009, 29(7): 7-12. [3] 刘渝根,王硕,田金虎,等. 接地网腐蚀诊断优化测量方法[J]. 重庆大学学报,2008,31(11):1303-1306. LIU Yugen, WANG Shuo, TIAN Jinhu, et al . A corrosion diagnosis method for optimizedment of grounding grids [J]. Journal of Chongqing University, 2008, 31(11): 1303-1306. [4] 刘渝根,腾永禧,陈先禄,等. 接地网腐蚀的诊断方法研究[J]. 高电压技术,2004,30(6):19-21. LIU Yugen, TENG Yongxi, CHEN Xianlu, et al . A method for corrosion diagnosis of grounding grid[J]. High Voltage Engineering, 2004, 30(6): 19-21. [5] 牛涛,罗先觉,王森,等. 接地网腐蚀故障诊断可测性分析[J]. 电工技术学报,2010,25(6):192-198. NIU Tao, LUO Xianjue, WANG Sen, et al . Test ability analysis of corrosion diagnosis for grounding grids[J]. Transactions of China Electrotechnical Society, 2010, 25(6): 192-198. [6] 许磊,李琳. 基于电网络理论的变电站接地网腐蚀及断点诊断方法[J]. 电工技术学报,2012,27(10):270-276. XU Lei, LI Lin. Fault diagnosis for grounding grids based on electric network theory [J]. Transactions of China Electrotechnical Society, 2012, 27(10): 270-276. [7] 刘健,倪云峰,王树奇. 接地网的分块模型及分块故障诊断[J]. 高电压技术,2011,37(5):1194-1202. LIU Jian, NI Yunfeng, WANG Shuqi. Grounding grids corrosion diagnosis using a block dividing approach[J]. High Voltage Engineering, 2011, 37(5): 1194-1202. [8] 刘利强,罗先觉,王森. 接地网腐蚀分块诊断的混合优化算法[J]. 中国电机工程学报,2009,29(7):33-38. LIU Liqiang, LUO Xianjue, WANG Sen. Hybrid optimal algorithm for corrosion diagnosis for grounding grids[J]. Proceedings of the CSEE, 2009, 29(7): 33-38. [9] 刘健,倪云峰,卢伟,等. 可及节点偏移对接地网故障诊断影响及修正[J]. 高电压技术,2008,34(11):2349-2354. LIU Jian, NI Yunfeng, LU Wei, et al . Influence of touchable nodes deviation on grounding grids crrosion diagnosis and its correction [J]. High Voltage Engineering, 2008, 34(11): 2349-2354. [10] 饶章权,刘渝根,李谦,等. 基于灵敏度的接地引下线偏移对接地网故障诊断的影响研究[J]. 南方电网技术,2010,4(S1):113-117. RAO Zhangquan, LIU Yugen, LI Qian, et al . Research on the influence of grounding down line deviation to fault diagnosis of grounding grid based on sensitivity[J]. Southern Power System Technology, 2010, 4(S1): 113-117. [11] 刘渝根,徐峰,刘小二,等. 拓扑结构改变对接地网故障诊断的影响分析[J]. 高压电器,2010,46(12):59-62. LIU Yugen, XU Feng, LIU Xiaoer, et al . Analysis on the influence of change of topology on the erosion diagnosis of grounding grids [J]. High Voltage Apparatus, 2010, 46(12): 59-62. [12] ZHANG Ruiqiang, HE Wei, LI Yi, et al . Studies on substation ground grids from the perspective of primary and inverse problems[J]. Proceedings of the CSEE, 2014, 34(21): 3548-3560. [13] 刘洋,崔翔,赵志斌. 变电站接地网结构判断与缺陷诊断方法[J]. 中国电机工程学报,2010,30(24):113-118. LIU Yang, CUI Xiang, ZHAO Zhibin. Method of structure estimation and fault diagnosis of substations’ grounding grids [J]. Proceedings of the CSEE, 2010, 30(24): 113-118. [14] 付志红,余慈拱,侯兴哲,等. 瞬变电磁法视电阻率成像的接地网断点诊断方法[J]. 电工技术学报,2014,29(9):253-259. FU Zhihong, YU Cigong, HOU Xingzhe, et al . Transient electromagnetic apparent resistivity imaging for break point diagnosis of grounding grids[J]. Transactions of China Electrotechnical Society, 2014, 29(9): 253-259. |