Electric Power ›› 2017, Vol. 50 ›› Issue (1): 30-36.DOI: 10.11930/j.issn.1004-9649.2017.01.030.07

• Special Column for Power Planning • Previous Articles     Next Articles

Analysis on New Energy Development Based on the 13th Five-Year Electric Power Planning

LI Qionghui, WANG Caixia   

  1. State Grid Energy Research Institute, Beijing 102209, China
  • Received:2016-12-14 Online:2017-01-20 Published:2017-01-23
  • Supported by:
    This work is supported by Science and Technology Project of SGCC (No. SGLNSY00FZJS1601337).

Abstract: On November 7th, 2016, the National Development and Reform Commission and State Energy Administration officially issued the“13th Five-Year(2016-2020) Power Development Planning”. According to the goals and key tasks set by the planning, and based on the history of new energy development and related statistics, an analysis is made on the scale, speed, layout and market consumption of new energy development during the 13th Five-Year period, and several planning issues related to high percentage new energy are discussed. The results show that, during the 13th Five-Year period, the growth rate of installed capacity of new energy will decrease, but the newly installed capacity of new energy will keep stable. And the development layout of new energy is expected to be adjusted significantly, which depends on whether the distributed development of new energy can make a breakthrough. Three measures are proposed to solve the integration problems of new energy, including adjusting the construction pace of new energy in the regions that already have serious integration problems, increasing the flexibility and adaptability of the power system, and orderly facilitating trans-provincial new energy consumption.

Key words: electric power, new energy, planning

CLC Number: