Electric Power ›› 2012, Vol. 45 ›› Issue (10): 1-6.DOI: 10.11930/j.issn.1004-9649.2012.10.1.5

• Special Conlribulion •     Next Articles

Comparison Study on Grid Codes for Connecting Wind Farm into Power System

DAI Hui-zhu, CHI Yong-ning   

  1. China Electric Power Research Institute, Beijing 100192, China
  • Received:2012-09-14 Online:2012-10-18 Published:2016-02-29

Abstract: The national standard GB/T 19963-2011 Technical Rules for Connecting Wind Farm to Power System was released in December 2011 and came into force from June 1, 2012. This paper focuses on interpreting the necessity of standard formulation and the detailed standard requirements, and conducting a detailed comparison study on the grid codes for connecting wind power to power system in other countries with many wind power installed capacities based on analysing the status of wind power development and the technical problems encountered. The formulation and implementation of the national wind power integration code will contribute a lot to upgrading the wind turbine technology and ensuring the secure and stable operation of the power system incorporating large-scale wind power.

Key words: wind power, grid code, dynamic reactive power, low voltage ride through, grid compliance test

CLC Number: