[1] 李乃永,梁军,赵义术. 并网光伏电站的动态建模与稳定性分析[J]. 中国电机工程学报,2011,31(10):12-18. LI Nai-yong, LIANG Jun, ZHAO Yi-shu. Research on dynamic modeling and stability of Grid-connected photovoltaic power station [J]. Proceedings of the CSEE, 2011, 31(10): 12-18. [2] 姚天亮,郑昕,杨德洲. 打捆并网方式下光伏电站无功补偿及谐波问题[J]. 电力建设,2011,32(8):24-28. YAO Tian-liang, ZHEN Xin, YANG De-zhou. Discussion about dynamic reactive power compensation and harmonic problems of PV power plants under bundled condition[J]. Electric power construction, 2011, 32(8): 24-28. [3] 郑志杰,李磊,王葵. 大规模光伏并网电站接入系统若干问题的探讨[J]. 电网与清洁能源,2010,18(2):74-76. ZHENG Zhi-jie, LI Lei, WANG Kui. Discussion on some issues of large scale PV grid connected system[J]. Power system and clean energy, 2010, 18(2): 74-76. [4] 白建华,辛颂旭,贾德香. 中国风电开发消纳及输送相关重大问题研究[J]. 电网与清洁能源,2010,26(1):14-17. BAI Jian-hua, XING Song-xu, JIA De-xiang. Study of major questions of wind power digestion and transmission in China [J]. Power System and Clean Energy, 2010, 26(1): 14-17. [5] 姚天亮,郑昕等. 酒泉二期300万千瓦风电工程接入系统设计—电力消纳问题分析[R]. 甘肃省电力设计院,2012.3. [6] 甘肃省电力设计院,甘肃省电力公司经济技术研究院. 甘肃500万千瓦光伏总体接入系统规划[R]. 2012.8. [7] 衣立东,朱敏亦,魏磊,等. 风电并网后西北电网调峰能力的计算方法[J]. 电网技术,2010,34(2):129-132. YI Li-dong, ZHU Min-yi, WEI Lei, et al . A computing method for peak load regulation ability of Northwest China Power Grid connected with large-scale wind farms[J]. Power System Technology, 2010, 34(2): 129-132. [8] 颜巧燕,温步瀛,江岳文. 风电并网后系统备用容量需求分析[J]. 电力与电工,2009,29(2):15-18. YAN Qiao-yan, WEN Bu-ying. Analysis for reserved capacity of system with wind power connecting into system[J]. Electric Power and Electrical Engineering, 2009, 29(2): 15-18. [9] 西北电力设计院,甘肃省电力公司. 适应于大规模新能源基地的电网电源结构和调峰能力研究[R]. 2012年. |