[1] 何永秀,王冰,熊威,等. 基于模糊综合评价的居民智能用电行为分析与互动机制设计[J]. 电网技术,2012,36(10):247-252. HE Yongxiu, WANG Bing, XIONG Wei, et al . Analysis of residents’ smart electricity consumption behavior based on fuzzy synthetic evaluation and the design of interactive mechanism[J].Power System Technology, 2012, 36(10): 247-258. [2] 刘严,谭忠富,乞建勋. 峰谷分时电价设计的优化模型[J]. 中国管理科学,2005,13(5):87-92. LIU Yan, TAN Zhongfu, QI Jianxun. Research on TOU rate design optimization model[J]. Chinese Journal of Management Science, 2005, 13(5): 87-92. [3] 闫国华,朱永生. 支持向量机回归的参数选择方法[J]. 计算机工程,2009,35(13):218-220. YAN Guohua, ZHU Yongsheng. Parameters selection method for support vector machine regression[J]. Computer Engineering, 2009, 35(13): 218-220. [4] 顾燕萍,赵文杰,吴占松. 最小二乘支持向量机的算法研究[J]. 清华大学学报(自然科学版),2010(7):1063-1066,1071. GU Yanping, ZHAO Wenjie, WU Zhansong. Least squares support vector machine algorithm[J]. Journal of Tsinghua University (Sci & Tech), 2010(7): 1063-1066, 1071. [5] 谢宏,魏江平,刘鹤立. 短期负荷预测中支持向量机模型的参数选取和优化方法[J]. 中国电机工程学报,2006,26(22):17-22. XIE Hong, WEI Jiangping, LIU Heli. Parameter selection and optimization method of SVM model for short-term load forecasting [J]. Proceedings of the CSEE, 2006, 26(22): 17-22. [6] DANIEL S K, GORAN S. Factoring the elasticity of demand in electricity prices[J]. IEEE Trans on Power Systems, 2000, 15(2): 612-617. [7] 陈沧杨,胡博,谢开贵,等. 计入电力系统可靠性与购电风险的峰谷分时电价模型[J]. 电网技术,2014,38(8):2141-2148. CHEN Cangyang, HU Bo, XIE Kaigui, et al . A peak-valley TOU price model considering power system reliability and power purchase risk [J]. Power System Technology, 2014, 38(8): 2141-2148. [8] 王玉玮. 支持向量机模型改进及在短期边际电价预测中的应用[D]. 保定:华北电力大学,2013. |