[1] 国家电力调度通信中心.国家电网2011年风电并网运行情况报告[R].2011. [2] 裴哲义,董存,辛耀中. 我国风电并网运行最新进展[J]. 中国电力,2010,43(6):78-82. PEI Zhe-yi, DONG Cun, XIN Yao-zhong. Review of operation and management of integrating wind power in China[J]. Electric power, 2010,43(6): 78-82. [3] 刘德伟,黄越辉,王伟胜,等.考虑调峰和电网输送约束的省级系统风电消纳能力分析[J].电力系统自动化,2011,35(22): 77-81. LIU De-wei, HUANG Yue-hui, WANG Wei-sheng, et al . Predicting the accommodation of wind energy in provincial system considering load-following and transmission-line limitation[J]. Automation of Electric Power Systems, 2011,35(22): 77-81. [4] 戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23. DAI Hui-zhu, WANG Wei-sheng, CHI Yong-ning. Recent wind power integration study in China[J]. Power System Technology, 2007,31(20):16-23. [5] GWEC(Global Wind Energy Council).全球风电装机数据 2011[R].2011, [6] 范高锋,王伟胜,刘纯,等.基于人工神经网络的风电功率预测[J].中国电机工程学报,2008,28(34):118-123. FAN Gao-feng, WANG Wei-sheng, LIU Chun, et al . Wind power prediction based on artificial neural network[J]. Proceedings of the CSEE, 2008,28(34):118-123. [7] 韩小琪,孙寿广,戚庆茹.从系统调峰角度评估电网接纳风电能力[J]. 中国电力,2010,43(6):16-19. HAN Xiao-qi, SUN Shou-guang, QI Qing-ru. Evaluation of wind power penetration limit from peak regulation[J]. Electric Power, 2010,43(6):16-19. [8] 张伯明,吴文传,郑太一,等.消纳大规模风电的多时间多尺度协调的有功调度系统设计[J].电力系统自动化,2011,35(1):1-6. ZHANG Bo-ming, WU Wen-chuan, ZHENG Tai-yi, et al . Design of a multi-time scale coordinated active power dispatching system for accommodating large scale wind power penetration[J]. Automation of Electric Power Systems, 2011, 35(1):1-6. |