[1] |
中国电力企业联合会. 2017年电力工业统计快报[R]. 北京:中国电力企业联合会, 2017.
|
[2] |
国家电网公司. 国家电网公司促进新能源发展白皮书2018[R]. 北京:国家电网公司, 2018.
|
[3] |
国家能源局. 2017年风电并网运行情况[EB/OL]. (2018-02-01)[2018-11-11]. http://www.nea.gov.cn/2018-02/01/c_136942234.htm
|
[4] |
孙荣富, 张涛, 梁吉. 电网接纳风电能力的评估及应用[J]. 电力系统自动化, 2011, 35(4):70-76 SUN Rongfu, ZHANG Tao, LIANG Ji. Evaluation and application of wind power integration capacity in power grid[J]. Automation of Electric Power Systems, 2011, 35(4):70-76
|
[5] |
姚金雄, 张世强. 基于调峰能力分析的电网风电接纳能力研究[J]. 电网与清洁能源, 2010, 26(7):25-28 YAO Jinxiong, ZHANG Shiqiang. Analysis on capacity of wind power integration into grid based on peak load regulation[J]. Power System and Clean Energy, 2010, 26(7):25-28
|
[6] |
王芝茗, 苏安龙, 鲁顺. 基于电力平衡的辽宁电网接纳风电能力分析[J]. 电力系统自动化, 2010, 34(3):86-90 WANG Zhiming, SU Anlong, LU Shun. Analysis on capacity of wind power integrated into Liaoning power grid based on power balance[J]. Automation of Electric Power Systems, 2010, 34(3):86-90
|
[7] |
韩小琪, 孙寿广, 戚庆茹. 从系统调峰角度评估电网接纳风电能力[J]. 中国电力, 2010, 43(6):16-19 HAN Xiaoqi, SUN Shouguang, QI Qingru. Evaluation of wind power penetration limit from peak regulation[J]. Electric Power, 2010, 43(6):16-19
|
[8] |
刘畅, 吴浩, 高长征, 等. 风电消纳能力分析方法的研究[J]. 电力系统保护与控制, 2014, 42(4):61-66 LIU Chang, WU Hao, GAO Changzheng, et al. Study on analysis method of accommodated capacity for wind power[J]. Power System Protection and Control, 2014, 42(4):61-66
|
[9] |
吕泉, 王伟, 韩水, 等. 基于调峰能力分析的电网弃风情况评估方法[J]. 电网技术, 2013, 37(7):1887-1894 LV Quan, WANG Wei, HAN Shui, et al. A new evaluation method for wind power curtailment based on analysis of system regulation capability[J]. Power System Technology, 2013, 37(7):1887-1894
|
[10] |
YU Z, LIN J, YU D, et al. The design of the model of wind power integration based on thermal power peakshaving[C]//International Conference on Mechatronics, Electronic, Industrial and Control Engineering, 2015
|
[11] |
BURKE D J, O'MALLEY M J. Factors influencing wind energy curtailment[J]. IEEE Transactions on Sustainable Energy, 2011, 2(2):185-193.
|
[12] |
董存, 李明节, 范高锋, 等. 基于时序生产模拟的新能源年度消纳能力计算方法及其应用[J]. 中国电力, 2015, 48(12):166-172 DONG Cun, LI Mingjie, FAN Gaofeng, et al. Research and application of renewable energy accommodation capability evaluation based on time series production simulation[J]. Electric Power, 2015, 48(12):166-172
|
[13] |
MCKENNA E, GRUNEWALD P, THOMSON M. Going with the wind:Temporal characteristics of potential wind curtailment in Ireland in 2020 and opportunities for demand response[J]. IET Renewable Power Generation, 2015, 9(1):66-77.
|
[14] |
舒印彪, 张智刚, 郭剑波, 等. 新能源消纳关键因素分析及解决措施研究[J]. 中国电机工程学报, 2017, 37(1):1-8 SHU Yinbiao, ZHANG Zhigang, GUO Jianbo, et al. Study on key factors and solution of renewable energy accommodation[J]. Proceedings of the CSEE, 2017, 37(1):1-8
|
[15] |
张正陵. 中国"十三五"新能源并网消纳形势、对策研究及多情景运行模拟分析[J]. 中国电力, 2018, 51(1):2-9 ZHANG Zhengling. Research on situation and countermeasures of new energy integration in the 13th five-year plan period and its multi-scenario simulation[J]. Electric Power, 2018, 51(1):2-9
|
[16] |
谢国辉, 何永胜, 王卿然. 中国东中部地区风电发展前景分析[J]. 中国电力, 2018, 51(3):100-104 XIE Guohui, HE Yongsheng, WANG Qingran. Research on development prospect of wind power in Eastern and Central China[J]. Electric Power, 2018, 51(3):100-104
|
[17] |
裴哲义, 王彩霞, 和青, 等. 对中国新能源消纳问题的分析与建议[J]. 中国电力, 2016, 49(11):1-7 PEI Zheyi, WANG Caixia, HE Qing, et al. Analysis and suggestions on renewable energy integration problems in China[J]. Electric Power, 2016, 49(11):1-7
|
[18] |
辛颂旭, 白建华, 郭燕珩. 甘肃酒泉风电特性研究[J]. 能源技术经济, 2010, 22(12):16-20 XIN Songxu, BAI Jianhua, GUO Yanheng. Study on wind power characteristics of Jiuquan Wind Power Base[J]. Energy Technology and Economics, 2010, 22(12):16-20
|
[19] |
张晋芳, 郑宽, 黄瀚, 等. 特高压直流主送新能源技术经济研究[J]. 中国电力, 2017, 50(6):152-157 ZHANG Jinfang, ZHENG Kuan, HUANG Han, et al. The technical and economic analysis on new energy mainly transmitted by UHVDC[J]. Electric Power, 2017, 50(6):152-157
|