Electric Power ›› 2017, Vol. 50 ›› Issue (6): 38-42.DOI: 10.11930/j.issn.1004-9649.2017.06.038.05

• Double-Reheat Coal-Fired Power Generation Technology • Previous Articles     Next Articles

Construction and Operation of the 1 000-MW Ultra-Supercritical Double Reheat Unit in Taizhou Ⅱ

ZHANG Shishan1, YANG Qin2, YANG Hongqiang1, ZHANG Sumin1   

  1. 1. Guodian Jiangsu Power Generation Co., Ltd., Nanjing 210014, China;
    2. China Guodian Corporation; Beijing 100034, China
  • Received:2017-03-20 Online:2017-06-20 Published:2017-07-12
  • Supported by:
    ; This work is supported by the National Key Technology Support Program (No. 2012BAA12B00).

Abstract: This paper describes the type selection and parameter determination principles of the 1 000-MW double reheat coal-fired power generation units. Through studies and rigorous demonstration, as well as the promotion of major technological innovation programs and the implementation of the demonstration project, the paper explores the technical risk control and project management points in the construction of the units. It also introduces the key points in the micromanagement, the clean installation, the process quality management, and the precise debugging. Since the operation, the operation optimization and management of the project have been sustained to satisfy all performance index requirements. The construction and operation of the project are demonstratively helpful for improving the technical levels of China’s efficient clean coal power generation equipments and the clean coal utilization.

Key words: coal-fired power generation, 1 000 MW, ultra-supercritical unit, double reheat cycle, construction, operation, demenstration power plant