[1] 唐斯庆, 张弥, 李建设, 等. 海南电网“9·26”大面积停电事故的分析与总结[J]. 电力系统自动化, 2006, 30(1): 1-7, 16 TANG Siqing, ZHANG Mi, LI Jianshe, et al. Review of blackout in Hainan on September 26th: causes and recommendations[J]. Automation of Electric Power Systems, 2006, 30(1): 1-7, 16 [2] 林伟芳, 孙华东, 汤涌, 等. 巴西“11·10”大停电事故分析及启示[J]. 电力系统自动化, 2010, 34(7): 1-5 LIN Weifang, SUN Huadong, TANG Yong, et al. Analysis and lessons of the blackout in Brazil power grid on November 10, 2009[J]. Automation of Electric Power Systems, 2010, 34(7): 1-5 [3] 陈明辉, 庞凯元, 尚慧玉, 等. 基于Vague值相似度的黑启动决策[J]. 电力建设, 2018, 39(11): 28-33 CHEN Minghui, PANG Kaiyuan, SHANG Huiyu, et al. Black-start decision-making based on similarity measures between Vague sets[J]. Electric Power Construction, 2018, 39(11): 28-33 [4] 高玮, 张炳达, 林济铿, 等. 基于Vague方法与PROMETHEE方法相结合的黑启动路径评估[J]. 中国电力, 2016, 49(7): 65-71 GAO Wei, ZHANG Bingda, LIN Jikeng, et al. Assessment of black start path based on Vague and PROMETHEE method[J]. Electric Power, 2016, 49(7): 65-71 [5] 王文慧, 刘天琪, 许韦华, 等. 基于博弈论和雷达图法的黑启动方案评估[J]. 电测与仪表, 2016, 53(8): 108-113 WANG Wenhui, LIU Tianqi, XU Weihua, et al. Evaluation for black-start schemes based on game theory and radar chart[J]. Electrical Measurement & Instrumentation, 2016, 53(8): 108-113 [6] 冷亚军, 陆青, 张俊岭. 基于差异性权重和协同过滤的黑启动方案评估[J]. 电力系统自动化, 2015, 39(20): 78-83 LENG Yajun, LU Qing, ZHANG Junling. Assessment of black-start schemes based on difference weight and collaborative filtering[J]. Automation of Electric Power Systems, 2015, 39(20): 78-83 [7] 冷亚军, 赵文会. 基于符号数据的黑启动方案评估[J]. 系统工程理论与实践, 2019, 39(7): 1744-1751 LENG Yajun, ZHAO Wenhui. Assessment on black-start schemes based on symbolic data[J]. Systems Engineering-Theory & Practice, 2019, 39(7): 1744-1751 [8] 李军徽, 孔明, 穆钢, 等. 电力系统黑启动关键技术研究综述[J]. 南方电网技术, 2017, 11(5): 68-77 LI Junhui, KONG Ming, MU Gang, et al. Overview of researches on key technologies of power system black-start[J]. Southern Power System Technology, 2017, 11(5): 68-77 [9] 林济铿, 蒋越梅, 岳顺民, 等. 基于DEA/AHP模型的电力系统黑启动有效方案评估[J]. 电力系统自动化, 2007, 31(15): 65-69, 110 LIN Jikeng, JIANG Yuemei, YUE Shunmin, et al. Assessment of effective schemes for power system blackstart based on DEA/AHP[J]. Automation of Electric Power Systems, 2007, 31(15): 65-69, 110 [10] 刘艳, 顾雪平, 张丹. 基于数据包络分析模型的电力系统黑启动方案相对有效性评估[J]. 中国电机工程学报, 2006, 26(5): 32-37, 94 LIU Yan, GU Xueping, ZHANG Dan. Data envelopment analysis based relative effectiveness assessment of power system black-start plans[J]. Proceedings of the CSEE, 2006, 26(5): 32-37, 94 [11] 钟慧荣, 顾雪平. 基于模糊层次分析法的黑启动方案评估及灵敏度分析[J]. 电力系统自动化, 2010, 34(16): 34-37, 49 ZHONG Huirong, GU Xueping. Assessment of power system black-start schemes based on fuzzy analytic hierarchy process and its sensitivity analysis[J]. Automation of Electric Power Systems, 2010, 34(16): 34-37, 49 [12] 李利娟, 吴军, 刘红良, 等. 计及新能源影响静动态结合的电网脆弱节点辨识[J]. 电力系统保护与控制, 2019, 47(2): 64-72 LI Lijuan, WU Jun, LIU Hongliang, et al. Static and dynamic integration method on identifying vulnerability nodes considering new energy power[J]. Power System Protection and Control, 2019, 47(2): 64-72 [13] 刘涛, 史成广, 林济铿. 基于改进DEA/AHP模型电力系统黑启动方案评估[J]. 电气应用, 2015, 34(22): 103-109 [14] 倪静. 基于TOPSIS法的黑启动决策方法[J]. 广东电力, 2009, 22(12): 8-11, 15 NI Jing. Black-start decision-making method based on TOPSIS[J]. Guangdong Electric Power, 2009, 22(12): 8-11, 15 [15] 姚历毅, 罗萍萍, 项胤兴, 等. 具有抗逆序及权重自适应的黑启动方案评估方法[J]. 中国电力, 2019, 52(3): 87-94 YAO Liyi, LUO Pingping, XIANG Yinxing, et al. Evaluation method of black start scheme with anti-reverse order and weight adaptive[J]. Electric Power, 2019, 52(3): 87-94 [16] 秦寿康. 综合评价原理与应用[M]. 北京: 电子工业出版社, 2003: 94-129. [17] 李士勇. 工程模糊数学及应用[M]. 哈尔滨: 哈尔滨工业大学出版社, 2004: 1-25, 96-108. [18] 林济铿, 蒋越梅, 郑卫洪, 等. 电力系统黑启动初始方案的自动形成[J]. 电力系统自动化, 2008, 32(2): 72-75 LIN Jikeng, JIANG Yuemei, ZHENG Weihong, et al. Automatic establishment of the initial black start schemes for power systems[J]. Automation of Electric Power Systems, 2008, 32(2): 72-75 [19] 刘映尚, 吴文传, 冯永青, 等. 黑启动过程中的负荷恢复[J]. 电网技术, 2007, 31(13): 17-22 LIU Yingshang, WU Wenchuan, FENG Yongqing, et al. Load recovery during power system blackstart[J]. Power System Technology, 2007, 31(13): 17-22 [20] 向思阳, 蔡泽祥, 刘平, 等. 基于AHP-反熵权法的配电网低碳运行模糊综合评价[J]. 电力科学与技术学报, 2009, 34(4): 69-76 XIANG Siyang, CAI Zexiang, LIU Ping, et al. Fuzzy comprehensive evaluation of the low-carbon operation of distribution network based on AHP-Anti-Entropy Method[J]. Journal of Electric Power Science and Technology, 2009, 34(4): 69-76 [21] 张吉军. 模糊层次分析法(FAHP)[J]. 模糊系统与数学, 2000, 14(2): 80-88 ZHANG Jijun. Fuzzy analytical hierarchy process[J]. Fuzzy Systems and Mathematics, 2000, 14(2): 80-88 [22] 林济铿, 李童飞, 赵子明, 等. 基于熵权模糊综合评价模型的电力系统黑启动方案评估[J]. 电网技术, 2012, 36(2): 115-120 LIN Jikeng, LI Tongfei, ZHAO Ziming, et al. Assessment on power system black-start schemes based on entropy-weighted fuzzy comprehensive evaluation model[J]. Power System Technology, 2012, 36(2): 115-120 [23] 杨威, 史加荣, 庞永锋. 模糊环境下基于TOPSIS的部分权重信息多属性群决策方法[J]. 模糊系统与数学, 2014, 28(2): 144-151 YANG Wei, SHI Jiarong, PANG Yongfeng. Fuzzy multi-attribute group decision making method based on TOPSIS with partial weight information[J]. Fuzzy Systems and Mathematics, 2014, 28(2): 144-151 [24] 赵子明, 幺莉, 林济铿, 等. 黑启动辅助决策支持系统[J]. 中国电力, 2012, 45(5): 81-86 ZHAO Ziming, YAO Li, LIN Jikeng, et al. Black-start decision support system[J]. Electric Power, 2012, 45(5): 81-86 [25] 胡丽芳, 关欣, 邓勇, 等. 一种三角模糊数型多属性决策方法[J]. 控制与决策, 2011, 26(12): 1877-1880, 1885 HU Lifang, GUAN Xin, DENG Yong, et al. Approach for fuzzy multi-attribute decision making[J]. Control and Decision, 2011, 26(12): 1877-1880, 1885
|