[1] 柳璐,程浩忠,马则良,等. 考虑全寿命周期成本的输电网多目标规划[J]. 中国电机工程学报,2012,32(22):46-53. LIU Lu, CHENG Haozhong, MA Zeliang, et al. Multi-objective transmission expansion planning considering life cycle cost[J].Proceedings of the CSEE, 2012, 32(22): 46-53. [2] 罗晓初,李乐,魏志连,等. 全寿命周期成本理论在配电变压器改造投资决策中的应用[J]. 电网技术,2011,35(2):207-211. LUO Xiaochu, LI Le, WEI Zhilian, et al. Applications of life cycle cost theory in decision-making of investment for distribution transformers renovation[J]. Power System Technology, 2011, 35(2): 207-211. [3] 郭基伟,谢敬东,唐国庆. 电力设备管理中的寿命周期费用分析[J]. 高电压技术,2003,29(4):13-15. GU Jiwei, XIE Jingdong, TANG Guoqing. Life cycle cost analysis in electrical equipment management [J]. High Voltage Engineering, 2003, 29(4): 13-15. [4] 柳璐,王和杰,程浩忠,等. 基于全寿命周期成本的电力系统经济性评估方法[J]. 电力系统自动化,2012,36(15):45-50. LIU Lu, WANG Hejie, CHENG Haozhong, et al. Economic evaluation of power systems based on life cycle cost[J].Automation of Electric Power Systems, 2012, 36(15): 45-50. [5] 宋春丽,刘涤尘,吴军,等. 基于差异化全寿命周期成本的电网规划经济性评估方法[J]. 电网技术,2013,37(7):1849-1855. SONG Chunli, LIU Dichen, WU Jun, et al. An economic assessment of power system planning based on differentiated life cycle cost [J]. Power System Technology, 2013, 37(7): 1849-1855. [6] 殷可,郁东升. 全寿命周期成本(LCC)在变电站主设备招标采购中的研究与实践[J]. 华东电力,2009,37(3):436-439. YIN Ke, YU Dongsheng. Application of life cycle cost to bid- invitation and purchase of main substation equipment[J]. East China Electric Power, 2009, 37(3): 436-439. [7] 史京楠,韩红丽,徐涛. 全寿命周期成本分析在变电工程规划设计中的应用[J]. 电网技术,2009,33(9):63-66. SHI Jingnan, HAN Hongli, XU Tao. Application of life cycle cost analysis in planning design of power transformation projects [J].Power System Technology, 2009, 33(9): 63-66. [8] 李涛,马薇,黄晓蓓. 基于全寿命周期成本理论的变电设备管理[J]. 电网技术,2008,32(11):50-53. LI Tao, MA Wei, HUANG Xiaobei. Power transformation equipment management based on life cycle cost theory[J]. Power System Technology, 2008, 32(11): 50-53. [9] 查申森,郑建勇,胡继军. 基于全寿命周期理念的500 kV变电站初期主接线选择[J]. 电网技术,2010,34(3):117-122. ZHA Shensen, ZHENG Jianyong, HU Jijun. Selection of main electrical connection of a 500 kV substation in initial stage based on idea of life cycle[J]. Power System Technology, 2010, 34(3): 117-122. [10] POLITANO D, FROHLICH K. Calculation of stress-dependent life cycle costs of a substation subsystem-demonstrated for controlled energization of unloaded power transformers[J]. IEEE Trans on Power Delivery, 2006, 21(4): 2032-2038. [11] HINOW M, MEVISSEN M. Substation maintenance strategy adaptation for life-cycle cost reduction using genetic algorithm[J].IEEE Trans on Power Delivery, 2011, 26(1): 197-204. [12] 姚明,陈红兵,李莉华,等. 全寿命周期成本(LCC)方法在500 kV地下变电站GIS 采购中的应用[J]. 中国电力,2008,41(8):32-34. YAO Ming, CHEN Hongbing, LI Lihua, et al. Research of LCC method and its applications to GIS purchases in 500 kV underground substations [J]. Electric Power, 2008, 41(8): 32-34. [13] 苏浩益. 智能电网条件下的电能质量综合评估[D]. 南宁:广西大学,2012. [14] 王光远. 未确知信息及其数学处理[J]. 哈尔滨建筑工程学院学报,1990,23(4):1-10. WANG Guangyuan. Unascertained information and its mathematical treatment[J]. Journal of Harbin University of Architecture and Engineering, 1990, 23(4): 1-10. [15] 陈剑勇,蔡红梅,苏浩益. 盲数理论在发电系统可靠性评估中的应用[J]. 电力系统保护与控制,2012,40(13):74-77,83. CHEN Jianyong, CAI Hongmei, SU Haoyi. Application of blind number theory in power generation system reliability evaluation[J]. Power System Protection and Control, 2012, 40(13): 74-77, 83. [16] 况骄庭,周毅,陈建华. 500 kV智能变电站220 kV HGIS配电装置设计优化[J]. 电力建设,2012,33(8):40-43. KUANG Jiaoting, ZHOU Yi, CHEN Jianhua. Design optimization for 220 kV HGIS distribution device in 500 kV intelligent substation [J]. Electric Power Construction, 2012, 33(8): 40-43. [17] 黄新波,贺霞,王霄宽,等. 智能变电站的关键技术及应用实例[J]. 电力建设,2012,33(10):29-33. HUANG Xinbo, HE Xia, WANG Xiaokuan, et al. Key technology and applied example of intelligent substation[J]. Electric Power Construction, 2012, 33(10): 29-33. [18] 赵永生,刘海峰,梁文武,等. 智能变电站同步整组试验方法[J]. 中国电力,2015,48(5):156-160. ZHAO Yongsheng, LIU Haifeng, LIANG Wenwu, et al. Study on the whole system synchronization testing method in smart substation [J]. Electric Power, 2015, 48(5): 15-160. [19] 韩本帅,石嫔,孙中尉,等. 智能变电站高级应用实施方案研究[J]. 中国电力,2013,46(8):148-152. HAN Benshuai, SHI Pin, SUN Zhongwei, et al. Research of implementation plan for advanced applications in smart substations [J]. Electric Power, 2013, 46(8): 148-152. [20] 黄天啸,刘平,辛光明,等. 智能变电站过程层网络风暴的分析与处理[J]. 中国电力,2014,47(11):112-115. HUANG Tianxiao, LIU Ping, XIN Guangming, et al. Analysis and treatment of process-ievel network storm in smart substation [J].Electric Power, 2014, 47(11): 112-115. |