[1] 白宏坤,王磊,李宗,等. 河南省电力需求发展趋势预测分析[J]. 中国电力,2014,47(2):146-151. BAI Hong-kun, WANG Lei, LI Zong, et al . Analysis and forecast on electricity demand trend of Henan province [J]. Electric Power, 2014, 47(2): 146-151. [2] 顾宇桂,司政,单葆国,等. 东部地区近期电力需求走势分析[J]. 中国电力,2012,45(10):27-29. GU Yu-gui, SI Zheng, SHAN Bao-guo, et al . Trend of recent power demand in eastern china[J]. Electric Power, 2012, 45(10):27-29. [3] 丁剑,艾明建,吴安平. 西部大开发第二个十年四川省电力需求预测[J]. 中国电力,2012,45(9):35-39. DING Jian, AI Ming-jian, WU An-ping. Electric power demand forecast for sichuan province in the second decade of China’s western development program [J]. Electric Power, 2012, 45(9):35-39. [4] 潘璠,贾文昭,许柏婷,等. 广东电网需求侧响应潜力分析[J].中国电力,2011,44(12):21-25. PAN Fan, JIA Wen-zhao, XU Bai-ting, et al . Analysis on demand-side response potential of Guangdong power grid[J].Electric Power, 2011, 44(12): 21-25. [5] 郑少鹏,邱建锋,邓若尘,等. 深圳市110 kV草埔全地下变电站建设要点[J]. 电力建设,2010,31(9):46-51. ZHENG Shao-peng, QIU Jian-feng, DENG Ruo-chen, et al . Construction essentials of the shenzhen 110 kV underground substation[J]. Electric Power Construction, 2010, 31(9): 46-51. [6] 王葵,尹成竹,沙智明. 济南特高压变电站500 kV主接线方案[J]. 电力建设,2010,31(10):43-49. WANG Kui, YIN Cheng-zhu, SHA Zhi-ming. Study on 500 kV electrical main connections of Ji’nan UHV substation [J]. Electric Power Construction, 2010, 31(10): 43-49. [7] 林毅,林章岁,蒋朋博. 福州特高压变电站500 kV主接线方案优化[J]. 电力建设, 2014, 35(1): 24-29. LIN Yi, LIN Zhang-sui, JIANG Peng-bo. Scheme optimization of 500 kV main electrical connection in Fuzhou UHV substation [J]. Electric Power Construction, 2014, 35(1): 24-29. [8] 郝阳,贺立斋,张建华,等. 变电站同塔双回进出线电磁环境分析[J]. 电力建设,2011,32(10):23-26. HAO Yang, HE Li-zhai, ZHANG Jian-hua, et al . Analysis on the electromagnetic environment under double-circuit in substation [J]. Electric Power Construction, 2011, 32(10): 23-26. [9] 侯婷. 绿色变电站的电气设计[J]. 电力建设,2012,33(5):45-48. HOU Ting. Electrical design of green substation[J]. Electric Power Construction, 2012, 33(5): 45-48. [10] 肖冰,徐迪. 750 kV变电站噪声预测及防治[J]. 电力建设,2012,33(6):30-33. XIAO Bing, XU Di. Noise prediction and control in 750 kV substation [J]. Electric Power Construction, 2012, 33(6): 30-33. [11] 李永明,王玉强,徐禄文,等. 变电站噪声预测和仿真分析[J]. 电力建设,2013,34(7):63-67. LI Yong-ming, WANG Yu-qiang, XU Lu-wen, et al . Audible noise prediction and simulation analysis in substation [J]. Electric Power Construction, 2013, 34(7): 63-67. [12] 孙宇晗,莫娟,曹枚根,等. 基于噪声控制的变电站平面布置优化设计[J]. 电力建设,2013,34(12):18-23. SUN Yu-han, MO Juan, CAO Mei-gen, et al . Optimal design of substation layout based on noise control[J]. Electric Power Construction, 2013, 34(12): 18-23. [13] 袁聪波,黄家彬. 变电站噪声分析及治理[J]. 上海电力,2002(4):59-61. YUAN Cong-bo, HUANG Jia-bing. The substation noise analysis and governance [J]. Shanghai Electric Power, 2002(4): 59-61. [14] 顾晓安,沈密群,朱振江,等. 变压器铁芯振动和噪声特性的试验研究[J]. 变压器,2003,40(4):1-4. GU Xiao-an, SHEN Mi-qun, ZHU Zhen-jiang, et al . Test research on vibrations and noise level in transformer core[J]. Transformer, 2003, 40(4): 1-4. [15] 祝志祥,韩钰,聂京凯,等. 变电站降噪用铝纤维吸声材料[J]. 中国电力,2012,45(7):57-61. ZHU Zhi-xiang, HAN Yu, NIE Jing-kai, et al . Research on sound-absorption material of aluminum fiber for substation noise reduction [J]. Electric Power, 2012, 45(7): 57-61. [16] 周建国,李莉华,杜茵,等. 变电站、换流站和输电线路噪声及其治理技术[J]. 中国电力,2009,42(3):75-78. ZHOU Jian-guo, LI Li-hua, DU Yin, et al . Review on methods of noise reducing for equipment in substations, converter stations and transmission lines [J]. Electric Power, 2009, 42(3): 75-78. [17] ROSS C F. Experiments on the active control of transformer noise [J]. Journal of Sound and Vibration, 1978, 61(4): 473-480. [18] QIU Xiao-jun, LI Xun, AI Yan-ting, et al . A waveform synthesis algorithm for active control of transformer noise: implementation [J]. Applied Acoustics, 2002, 63: 467-479. [19] 马杰. 基于神经网络的自适应噪声主动控制研究[D]. 杭州:浙江理工大学,2011. [20] 侯宏,杨建华,孙进才. 神经网络BP算法在有源消声中的应用[J]. 西北工业大学学报,1999,17(1):25-28. HOU Hong, YANG Jian-hua, SUN Jin-cai. Neural network BP algorithm applied to adaptive active noise control[J]. Journal of Northwestern Polytechnical University, 1999, 17(1): 25-28. [21] 李传光,姜丽飞,李长青. RBF网络在履带车辆舱室内有源降噪的实验研究[J]. 北京理工大学学报,2004,24(4):297-299. LI Chuan-guang, JIANG Li-fei, LI Chang-qing. Active noise control in military vehicle cabin using RBF neural network[J].Transactions of Beijing Institute of Technology, 2004, 24(4): 297-299. [22] 姜惠兰,陈平,王敬朋,等. 改进粒子群算法在电网无功优化中的应用[J]. 中国电力,2011,44(12):11-15. JIANG Hui-lan, CHEN Ping, WANG Jing-peng, et al . Application of improved particle swarm optimization in power system reactive power control [J]. Electric Power, 2011, 44(12): 11-15. |