[1] 侯慧,尹项根,游大海,等. 国外经验对中国电力系统应急减灾机制的启示[J]. 电力系统自动化,2008,32(12):89-93. HOU Hui, YIN Xiang-gen, YOU Da-hai, et al . Apocalypse of overseas experiences on emergency anti-disaster mechanism for China power system[J]. Automation of Electric Power Systems,2008, 32(12): 89-93. [2] 郭晓鸣,刘俊勇. 电网应急资源调度方案研究[J]. 电力系统保护与控制,2011,39(20):11-16. GUO Xiao-ming, LIU Jun-yong. Research on power disaster-relief resources allocation schedule model[J]. Power System Protection and Control, 2011, 39(20): 11-16. [3] 丁道齐. 降级电力系统物理脆弱性应对自然灾害和恶意攻击[J]. 中国电力,2009,42(6):26-31. DING Dao-qi. Reduce the physical vulnerability of the electric power system to reply natural disasters and hostile attack[J]. Electric Power, 2009, 42(6): 26-31. [4] 张海龙,李雄飞,王仁彪. 启发式遗传算法求解应急资源调度[J]. 吉林大学学报:工学版,2010,40(3):758-762. ZHANG Hai-long, LI Xiong-fei, WANG Ren-biao. Emergency resources distribution based on heuristic genetic algorithm[J].Journal of Jilin University:Engineering and Technology Edition,2010, 40(3): 758-762. [5] WANG S S, WANG Y, SUN J. An optimized emergency resources allocation algorithm for large-scale public emergency[C]//Proceedings of the Sixth International Conference on Machine Learning and Cybernetics. Hong Kong, China, 2007. [6] 周广亮. 应急资源配置与调度文献综述与思考[J]. 预测,2011, 30(3):76-80. ZHOU Guang-liang. Review and perspective of emergency resources allocation and scheduling[J]. Forecasting, 2011, 30(3):76-80. [7] 朱永利,陈英伟,韩凯,等. 基于改进的最大最小蚁群算法求解电力线路最佳抢修路径[J]. 计算机应用研究,2009,26(9):3436-3439. ZHU Yong-li, CHEN Ying-wei, HAN Kai, et al . Searching optinal rush repair path of power lines based on improved max-min ant colony algorithm[J]. Application Research of Computers, 2009, 26(9): 3436-3439. [8] 崔巍,王本德. 电力抢修监控调度系统及其通信方式的研究[J]. 中国电力,2002,35(12):60-62. CUI Wei, WANG Ben-de. Research on supervising & scheduling system of electrical repairing adopting GPS and its communication way [J]. Electric Power, 2002, 35(12): 60-62. [9] 吴强,滕欢,王凯富. 基于GPRS/GPS/GIS的电力抢修实时调度系统构建[J]. 继电器,2005,33(17):70-73. WU Qiang, TENG Huan, WANG Kai-fu. Structure of electrical repairs real-time scheduling system based on GPRS/GPS/GIS [J].Relay, 2005, 33(17): 70-73. [10] 刘映尚,张碧华,周云海. 黑启动过程中继电保护和安全自动装置的特性和运动[J]. 中国电力,2005,38(5):25-28. LIU Ying-shang, ZHANG Bi-hua, ZHOU Yun-hai. Operational issues of protections and system security equipments in black start [J]. Electric Power, 2005, 38(5): 25-28. [11] 杜彦巍. 提高低频减载动作速度和减载准确性的方法研究[D]. 重庆:重庆大学,2006. [12] 钟慧荣. 电力系统黑启动与网架重构技术研究[D]. 北京:华北电力大学,2012. [13] 尚敬福. 大面积停电应急关键理论及技术研究[D]. 北京:华北电力大学,2009. [14] 罗萍萍,林济铿,李丁. 电力系统黑启动初始方案搜索算法[J].中国电力,2011,44(5):19-25. LUO Ping-ping, LIN Ji-keng, LI Ding. Search algorithm of black start initial scheme [J]. Electric Power, 2011, 44(5): 19-25. [15] 周莉梅,范明天. 城市电网用户停电损失估算及评价方法研究[J]. 中国电力,2006,39(7):70-73. ZHOU Li-mei, FAN Ming-tian. Research on customer outage cost assessment and its evaluation method in urban electric power network [J]. Electric Power, 2006, 39(7): 70-73. [16] 周莉梅,范明天,张祖平. 基于重要用户的应急电源优化配置[J]. 电力系统自动化,2007,31(6):99-102. ZHOU Li-mei, FAN Ming-tian, ZHANG Zu-ping. Optimal allocation of emergency power supplies for urban important customers[J]. Automation of Electric Power Systems, 2007, 31(6):99-102. [17] 万义国,游小青. 优化建模软件LINGO在运筹学中的应用[J]. 山西建筑,2007,33(15):367-368. WAN Yi-guo, YOU Xiao-qing. The application of model construction software LINGO in operational research[J]. Shanxi Architecture, 2007, 33(15): 367-368. |