[1] 聂鹏飞.王滩电厂脱硫系统经济运行初探[J]. 电力科技与环保,2010,26(4):57-59. NIE Peng-fei. Economic operation of FGD system in Wangtan power plant[J]. Electric Power Technology and Environmental Protection, 2010, 26(4): 57-59. [2] 马英,周洪光. 无旁路烟道的湿法脱硫系统运行研究[J]. 热力发电,2010,39(8):96-97. MA Ying, ZHOU Hong-guang. Study on operation on wet desulphurization system for flue duct without bypass[J]. Thermal Power Generation, 2010, 39(8): 96-97. [3] 白云峰,许正涛,吴树志,等. 脱硫机组取消旁路烟道的技术经济分析[J]. 中国电力,2008,41(1):73-75. BAI Yun-feng, XU Zheng-tao, WU Shu-zhi, et al . Technical and economic analysis on cancelling bypass gas duct in wet-FGD installations[J]. Electric Power, 2008, 41(1): 73-75. [4] 靳达,张国庆,李增枝,等. 燃煤电厂无旁路烟气脱硫系统的设计与调试[J]. 电力科技与环保,2011,27(4):35-37. JIN Da, ZHANG Guo-qing, LI Zeng-zhi, et al . Power plant flue gas desulphurization system without bypass designing and debugging[J]. Electric Power Technology and Environmental Protection, 2011, 27(4): 35-37. [5] 聂鹏飞,孟庆庆,武东. 燃煤电厂湿法脱硫浆液循环泵叶轮磨损的分析和修复[J]. 中国电业:技术版,2011(4):54-57. NIE Peng-fei, MENG Qing-qing, WU Dong. Analysis and repair of WFGD slurry circulating pump impeller attrition in coal-fired power plant[J]. China Electric Power: Technology Edition, 2011(4): 54-57. [6] 聂鹏飞,边东升,吴学民,等. 600 MW机组湿法脱硫系统除雾器堵塞原因分析及对策[J]. 华电技术,2011,33(11):69-73. NIE Peng-fei, BIAN Dong-sheng, WU Xue-min, et al . Analysis on reasons of demister blockage of 600 MW unit wet FGD systeme and countermeasures[J]. Huadian Technology, 2011, 33(11): 69-73. [7] 李晓金,甄志. 取消GGH后湿法烟气脱硫系统设计方案[J]. 中国电力,2010,43(11):56-59. LI Xiao-jin, ZHEN Zhi. Discussion on wet flue gas desulfurization system scheme for uninstalling GGH[J]. Electric Power, 2010, 43(11): 56-59. [8] 聂鹏飞,吴学民,窦中秋. 600 MW机组湿法脱硫添加剂试验研究[J].节能,2011,30(5):33-35. NIE Peng-fei, WU Xue-min, DOU Zhong-qiu. Experimental study on wet flue gas desulphurization with additives for 600 MW units[J]. Energy Conservation, 2011, 30(5): 33-35. [9] 刘璞,谈琪英,汤晓舒. “烟塔合一”、合并风机、脱硫无旁路烟道热电机组烟道系统设计[J]. 电力建设,2010,31(3):74-78. LIU Pu, TAN Qi-ying, TANG Xiao-shu. Flue-gas duct system design in co-generation power plant with stack-in cooling tower,fan combined, non-bypass FGD[J]. Electric Power Construction, 2010, 31(3): 74-78. [10] 王义兵,郑建农,苏杭. 无旁路FGD原烟道烟气预处理装置[J].热力发电,2011,40(12):107. WANG Yi-bing, ZHENG Jian-nong, SU Hang. No bypass FGD raw flue gas pretreatment device[J]. Thermal Power Generation,2011, 40(12): 107. |