Research on Quota Estimate Model for Prototype Tower Test

GENG Pengyun1, WANG Mianbin1, AN Lei1, QI Xia1, YANG Yang1, WANG Jianjun2   

  1. 1. State Grid Jibei Electric Economic Research Institute, Beijing 100040, China;
    2. School of Economics and Management, North China Electric Power University, Beijing 102206, China
  • Received:2016-04-11 Online:2016-10-10 Published:2016-11-07
  • Supported by:
    This work is supported by Projects funded by National Natural Science Foundation of China (No. 71401054).

Abstract: Prototype tower test is a necessary link for power grid construction. At present, the charging standard of tower test is based on “Yuan/Ton” at large, which is not supported by any accurate references. In order to accurately determine the charging standard for prototype tower test and provide a basis for cost estimate and budgetary planning, the paper firstly clarifies the seven working procedures for prototype tower test, and then analyzes the influential factors of the charging standard for prototype test. Based on the collected real data, the costs for labour, material and machinery are determined with the statistical analysis method. A quota estimate model is established for prototype tower test of transmission lines based on the quota estimate theory and its rationality is tested through a case study.

Key words: power grid, transmission lines, tower experiment, quota determination, statistical analysis