Study on the Application of Roots-Water Ring Pump in Large Direct Air-Cooling Power Plant ACC System

AN Yajun1, ZHANG Zhiyong2, CHEN Ruijun1, SUN Jian1, ZHAO Ziyuan3, SHEN Mengling3   

  1. 1. Inner Mongolia Jinglong Power Generation Co., LTD., Fengzhen 012100, China;
    2. Beijing Energy Group Co., LTD., Beijing 100022, China;
    3. Nuclear Engineering Research and Design Co., LTD., Beijing 101300, China
  • Received:2018-06-15 Revised:2018-06-28 Online:2018-11-05 Published:2018-11-16

Abstract: In order to solve the problem of cavitation of the electric water ring vacuum pump used in thermal power plants, through the test on the vacuum system output of a 600-MW direct air-cooling unit, this paper proposes that there exists the maximum suction output in the water ring pump operation, and analyzes the reasons why the output may decrease. Then the cavitation of the water ring pump is also investigated associated with the issue of water ring pump rotor cracks. Based on the study, a front dewatering roots-water ring pump group system is designed. By taking the test data and the pump group selection theory into account, an alternative scheme for the existing pump group is put forward, which can effectively tackle the problem and remarkably save the energy.

Key words: thermal power plant, direct air-cooling unit, water ring pump, cavitation, air leakage rate, isothermal compression, pressure ratio, conductance