Electric Power ›› 2014, Vol. 47 ›› Issue (8): 135-138.DOI: 10.11930/j.issn.1004-9649.2014.8.135.3

• Information and Communication • Previous Articles     Next Articles

Secondary Development of BPA Programming Based on Knowledge Base

LI Peng-fei1, ZHOU Zhi-yong1, ZHANG Hang1, ZHOU Ting-hui2, YAN Zheng2   

  1. 1. Shandong Electric Power Engineering Consulting Institute Corr, Ltd., Jinan 250013, China;
    2. Key Laboratory of Control of Power Transmission and Conversion of Ministry of Education, Shanghai Jiao Tong University, Shanghai 200240, China
  • Received:2014-04-04 Online:2014-08-18 Published:2015-12-10

Abstract: For modern power system, the difficulty of using N-2 principles to execute the power system simulation increases constantly. The conventional way to rehearse the contingency manually is laborious and prone to omissions. Therefore, a new method is developed to identify the severest faults and the weakness of the power system, which makes a smooth combination of the N-2 security and stability calculation software with the BPA software and brings in the knowledge base. For the same side of grids, the new method needs only a few cases to simulate, which shortens the total simulation time, and thus achieve a fast simulation of the power system.

Key words: BPA, secondary development, N-2, security and stability principle, knowledge base, power system, calculation software, fast simulation

CLC Number: