Electric Power ›› 2024, Vol. 57 ›› Issue (8): 145-151.DOI: 10.11930/j.issn.1004-9649.202304103

• Power System • Previous Articles     Next Articles

Dynamic Optimization Model of AGC Units Considering TCPS Assessment Constraints

Sheng CHEN1(), Honglue ZHANG1, Tian XIA1, Xue YANG2(), Wenjun ZHANG3, Wei YAN2   

  1. 1. Power Dispatching Control Center of Guizhou Power Grid Co., Ltd., Guiyang 550002, China
    2. State Key Laboratory of Power Transmission Equipment & System Security and New Technology, Chongqing 400044, China
    3. School of Business, Shanghai DianJi University, Shanghai 201306, China
  • Received:2023-05-11 Accepted:2023-08-09 Online:2024-08-23 Published:2024-08-28
  • Supported by:
    This work is supported by Science and Technology Project of Guizhou Power Grid Corporation (No.GZKJXM20210372).

Abstract:

In recent years, power grid has begun to use the transformational control performance standard (TCPS) to assess the level of automatic generation control (AGC) in various regions. However, existing researches only consider the assessment of control performance standard (CPS). In view of this, a dynamic optimization model of AGC units considering TCPS is proposed, which takes the minimum comprehensive adjustment cost of secondary frequency regulation as the objective and the system power balance and TCPS assessment as the constraints. The piecewise functions of the TCPS assessment constraints in the new model are linearized to achieve the efficient solution of the model. Based on a modified IEEE example, an AGC hysteresis control strategy in engineering and CPS, the effectiveness of the model is verified through simulation.

Key words: automatic generation control, dynamic optimization, hysteresis control