Revision and Improvement on the System of Commissioning Standards for PWR Nuclear Power Plant in China

KE Lei-lei1, CHEN Jun1, CAO Cong-min1, QIN Yan-feng1, WANG Kun2   

  1. 1. China Nuclear Power Engineering Co., Ltd., Shenzhen 518124, China;
    2. Institute for Standardization of Nuclear Industry, Beijing 100091, China
  • Received:2014-07-05 Online:2014-11-18 Published:2015-12-08

Abstract: Although the system framework of the commissioning standards for PWR nuclear power plants in China has been established, during the practical application it seems not yet perfect for the industry. The topics on revision and improvement of the system are still quite popular. Based on the research of the related systems in the countries at the leading edge of nuclear power industry, such as USA and France, as well as the existing system both for PWR nuclear power plants and conventional power plants in China, in this paper some suggestions are proposed on the revision and improvement to the existing issues, and also a high-level system design framework and related key points are provided.

Key words: PWR nuclear power plant, commissioning, standard system, revision and improvement, top layer design