Electric Power ›› 2012, Vol. 45 ›› Issue (9): 29-34.DOI: 10.11930/j.issn.1004-9649.2012.9.29.5

• Power Syslem • Previous Articles     Next Articles

Study on Circuit Service Without Total Outage of the 500 kV Transmission Line of Four Circuits on One Tower

JIN Yi1, XIAO Yun2, LIU Ting3, LIU Kai3, XIAO Bin3   

  1. 1. Jiangsu Electric Power Company, Nanjing 210024, China;
    2. Wuxi Power Supply Company, Wuxi 214061, China;
    3. China Electric Power Research Institute, Wuhan 430074, China
  • Received:2012-06-27 Online:2012-09-18 Published:2016-02-29

Abstract: In order to provide a technical basis for circuit service without total outage of the 500 kV transmission line of four circuits on one tower, the induced voltage of outage circuits were calculated by simulation under the condition of two circuits operating while the other two outage, or three circuits operating while the other one outage. The calculation result indicates that when the two ends of outage circuits is ungrounded, the max peak value of the induced voltage of outage circuits can reach as high as 105 kV; when the two ends of outage circuits is grounded, the max peak value of the induced voltage of outage circuits can also reach as high as 95 V. It is proposed that, when the 500 kV four circuits on one tower is incomplete outage, the service operation can be live working, or power-off working with safety protective measures.

Key words: 500 kV, four circuits on one tower, incomplete outage, induced voltage, service operation