[1] 韩捷. 基于数值计算的核电站蒸汽发生器传热管涡流检测的研究[D]. 兰州:兰州理工大学,2009:14-15. [2] 侯素霞,赵福宇,罗积军,等. 蒸汽发生器传热管腐蚀监测技术研究[J]. 原子能科学技术,2009,43(4):334-338. HOU Suxia, ZHAO Fuyu, LUO Jijun, et al. Analysis on corrosion inspection of steam generator heat transfer tubes[J]. Atomic Energy Science and Technology, 2009, 43(4): 334-338. [3] 杨宝初. 我国核蒸汽发生器传热管在役检测现状[J]. 无损检测,2000,22(5):215-216,218. YANG Baochu. The state-of-the-art of inservice inspection of the exchange tubes of nuclear steam generators[J]. Nonde Structive Testing, 2000, 22(5): 215-216, 218. [4] Ryan RLowes. Design specification for AP1000 steam generator for RCS, APP-MB01-Z0-101[S]. [5] 束国刚,陆念文. 压水堆核电厂关键金属部件的老化和寿命评估[J]. 中国电力,2006,39(5):53-58. SHU Guogang, LU Nianwen. Aging problems and life evaluation for the key metallic components in PWR nuclear power plant[J]. Electric Power, 2006, 39(5): 53-58. [6] 宋志刚. 中国压水堆蒸汽发生器传热管的研究及国产化[J]. 钢铁研究学报,2013,25(8):1-5. SONG Zhigang. Localization about steam generator tube of pressurized water reactor nuclear power plant unit in China[J]. Journal of Iron and Steel Research, 2013, 25(8): 1-5. [7] 陶于春,梁瞻翔,林忠元,等. 压水堆核电站在役检查用无损检测技术发展概况[J]. 无损检测,2009,31(12):959-966. TAO Yuchun, LIANG Zhanxiang, LIN Zhongyuan, et al. Development status of NDT technology for PWR NPP in service inspection [J]. Nonde Structive Testing, 2009, 31(12): 959-966. [8] 丁训慎. 核电站蒸汽发生器传热管的点腐蚀及其防护[J]. 腐蚀与防护,2007,28(7):364-366. DING Xunshen. Pitting and its protection of steam generator tubes in nuclear power plants [J]. Corrosion & Protection, 2007, 28(7): 364-366. [9] 卢华兴. AP1000蒸汽发生器U型管合金材料国产化研究[J]. 核动力工程,2011,32(3):29-32. LU Huaxing. Study on homemade alloy uwed in SG U-tubes of AP1000 [J]. Nuclear Power Engineering, 2011, 32(3): 29-32. [10] 刘亮,周涛,宋明强. AP1000与大亚湾核电站蒸汽发生器的对比与分析[J]. 华东电力,2013,41(2):417-419. LIU Liang, ZHOU Tao, SONG Mingqiang. Comparative analysis of AP1000 and steam generator of daya bay nuclear power plant[J]. East China Electric Power, 2013, 41(2): 417-419. [11] ASME锅炉压力容器规范第XI卷IWB分卷,IWB-2200役前检验[S]. 1998. [12] 核电厂在役检查,HAD103-07[S]. 1988. [13] 官益豪. 三门核电AP1000机组无损检验技术能力验证实践探讨及分析[J]. 无损检测,2014,36(5):73-79. GUAN Yihao. Discussion and analysis of the practices of non- destructive testing qualiticaion for Sanmen AP1000 Nuclear Power Plant [J]. Nonde Structive Testing, 2014, 36(5): 73-79. [14] 姜素云,董静. 核电蒸发器用传热管生产工艺简介[J]. 冶金设备,2012(195):117-120. JIANG Suyun, DONG Jing. Superficial analysis on the technological pragresses of nuclear power steam generator tubes[J]. Metallurgical Equipment, 2012(195): 117-120. |