[1] 屈靖,郭剑波. “九五”期间我国电网事故统计分析[J]. 电网技术,2004,28(21):60-63. QU Jing, GUO Jianbo. Statistics and analysis of faults in main domestic power systems from 1996 to 2000[J]. Power System Technology, 2004, 28(21): 60-63. [2] 张皖军,尹其云. 1996年电网事故的启示[J]. 电网技术,1996,21(4):54-57. ZHANG Wanjun, YIN Qiyuan. Analyses of power system faults occurred in 1996 and some suggestions for fault treatment[J]. Power System Technology, 1996, 21(4): 54-57. [3] 郭文兵,邓喀中. 高压输电线铁塔采动损害与保护技术现状及展望[J]. 煤炭科学技术,2011,39(1):97-106. GUO Wenbing, DENG Kazhong. Status and prospects of mining damage and protection technology of high voltage transmission line iron tower [J]. Coal Science and Technology, 2011, 39(1):97-106. [4] 张建强,杨昆,王予东,等. 煤矿采空区地段高压输电线路铁塔地基处理的研究[J]. 电网技术,2006,30(2):30-34. ZHANG Jianqiang, YANG Kun, WANG Yudong, et al. Research on foundation treatment of high voltage transmission towers erected above goaf of coalmine[J]. Power System Technology,2006, 30(2): 30-34. [5] 张联军,王宇伟. 高压输电铁塔下采煤技术研究[J]. 河北煤炭,2002(4):12-13. ZHANG Lianjun, WANG Yuwei. Study on mining under high voltage transmission tower [J]. Hebei Coal, 2002(4): 12-13. [6] 刘鸣,李永诰,张厚启,等. 地质灾害区输电塔架安全分析[J].中国电力,2012,45(5):34-38. LIU Ming, LI Yonggao, ZHANG Houqi, et al. Safety analysis of typical transmission tower in geologic disaster zone[J]. Electric Power, 2012, 45(5): 34-38. [7] 文运平,郭文兵,郑彬. 高压输电铁塔下采煤的安全性分析[J].煤矿开采,2010,15(4):35-37. WEN Yunping, GUO Wenbing, ZHENG Bin. Safety analysis of mining coal under power transmission towers[J]. Coal Mining Technology, 2010, 15(4): 35-37. [8] 代泽兵,鲁先龙,程永锋. 煤矿采空区架空输电线路基础研究[J]. 武汉大学学报,2009,4(10):312-315. DAI Zebin, LU Xianlong, CHENG Yongfeng. Research on foundation of transmission line tower in mined-out areas[J]. Engineering Journal of Wuhan University, 2009, 4(10): 312-315. [9] 史振华.采空区输电线路直线自立塔基础沉降及处理方案[J].山西电力技术,1997,17(3):18-20. SHI Zhenhua. Treatment to foundation settlement of self supporting tangent transmission tower in mining subsidence area [J]. Shanxi Electric Power, 1997, 17(3): 18-20. [10] 孙俊华. 煤矿采空区线路设计技术[J]. 山西电力,2004(3):13-14. SUN Junhua. Experience and measure for design the transmission line in empty coal mine [J]. Shanxi Electric Power, 2004(3): 13-14. [11] 袁广林,张云飞,陈建稳,等. 塌陷区输电铁塔的可靠性评估[J]. 电网技术,2010,34(1):214-218. YUAN Guanglin, ZHANG Yunfei, CHEN Jianwen, et al. Reliability assessment of transmission tower in mining subsidence area [J]. Power System Technology, 2010, 34(1): 214-218. [12] 秦庆芝,曹玉杰,毛彤宇,等. 特高压输电线路煤矿采动影响区铁塔基础设计研究[J]. 电力建设,2009,30(2):18-21. QIN Qingzhi, CAO Yujie, MAO Tongyu, et al. Design study of UHV line tower foundation in areas affected by coal mining excavation [J]. Electric Power Construction, 2009, 30(2): 18-21. [13] 杨风利,杨靖波,韩军科,等. 煤矿采空区基础变形特高压输电塔的承载力计算[J]. 中国电机工程学报,2009,29(1):100-106. YANG Fengli, YANG Jingbo, HAN Junke, et al. Bearing capacity computation of UHV transmission tower with foundation deformation above coal of goaf mine [J]. Proceedings of the CSEE, 2009, 29(1): 100-106. [14] 秦力,张学礼,陶颐格. 500 kV输电铁塔结构体系可靠性分析[J]. 中国电力,2008,41(12):64-68. QIN Li, ZHANG Xueli, TAO Yige. Analysis on reliability of 500 kV transmission line tower structure [J]. Electric Power, 2008, 41(12): 64-68. [15] 刘思远,夏开全. 输电线路混凝土电杆安全性评估方法研究[J]. 中国电力,2013,46(1):66-68. LIU Siyuan, XIA Kaiquan. Evaluation method for concrete pole safety of overhead transmission line [J]. Electric Power, 2013, 46(1): 66-68. [16] 何国清,杨伦,凌赓娣,等. 矿山开采沉陷学[M]. 徐州:中国矿业大学出版社,1991. HE Guoqing, YANG Lun, LING Gengdi, et al. Mining subsidence science[M]. Xuzhou:China University of Mining and Technology Press, 1991. |