[1] 海南电力工业发展“十二·五”及中长期规划研究[R].武汉:中南电力设计院,2010. [2] 朱庆春,蔡黎,康义.海南建设核电的必要性和可行性探讨[J].中国电力,2009,42(4):84-87.ZHU Qing-chun, CAI Li, KANG Yi. Discussion on necessity and feasibility of Hainan nuclear power plant[J]. Electric Power, 2009, 42(4):84-87. [3] 陈东平.我国抽水蓄能电站工程建设展望[J].中国电力,2001, 34(9):8-9.CHEN Dong-ping. Prospects for the construction of pumped storage hydropower station project in China[J]. Electric Power,2001,34(9):8-9. [4] 陈政,王巍,钟胜,等.河南电网天池抽水蓄能电站建设必要性分析[J].中国电力, 2009,42(9):20-25.CHEN Zheng, WANG Wei, ZHONG Sheng, et al . Necessity analysis of building Tianchi pumped-storage power plant[J].Electric Power, 2009,42(9):20-25. [5] 海南电网中长期调峰电源规划研究[R].武汉:中南电力设计院,2010. [6] 王楠,白建华,李友,等.东北电网抽水蓄能电站建设规模研究[J].中国电力,2007,40(2):1-3.WANG Nan, BAI Jian-hua, LI You, et al . Study on construction scale of pumped storage power plants in northeast China power grid[J]. Electric Power, 2007,40(2):1-3. [7] 王楠,白建华,刘贵元,等.国外抽水蓄能电站发展经验及相关启示[J].中国电力,2009,42(1):89-92.WANG Nan, BAI Jian-hua, LIU Gui-yuan, et al . Development experiences of pumped storage hydropower plants in the world and related suggestions[J]. Electric Power, 2009,42(1):89-92. [8] 海南昌江核电厂接入电网条件专题研究[R].武汉:中南电力设计院,2009. [9] 海南琼中抽水蓄能电站接入系统设计与机组选型及系统适应性研究[R].武汉:中南电力设计院,2011. [10] DL 755—2001 电力系统安全稳定导则[S].北京:中国电力出版社,2001. [11] 海口电厂“大代小”技改工程对海南电网安全稳定运行的影响分析专题报告[R].武汉:中南电力设计院,2004. [12] 周双喜,王永强,孟庆和.影响抽水蓄能机组动态稳定性的因素及PSS的应用[J].中国电力,1993,26(10):28-32. [13] KUNDUR P.电力系统稳定与控制[M].周孝信,宋永华,李兴源,等译.北京:中国电力出版社,2002. [14] 张智刚,王海忠,方思立,等.十三陵抽水蓄能电厂200 MW机组励磁及PSS参数测试[J].中国电力,1999,32(5):39-42.ZHANG Zhi-gang, WANG Hai-zhong, FANG Si-li, et al . Excitation and PSS parameters measurement on 200 MW unit of ming tomb pumped storage station[J]. Electric Power, 1999,32(5):39-42. [15] 雷为民,刘增煌,任志武.十三陵抽水蓄能电厂200 MW机组PSS投运试验及计算分析[J].中国电力,1999,32(11):48-51.LEI Wei-min, LIU Zeng-huang, REN Zhi-wu. PSS commissioning test and calculation analysis for 200 MW unit ming tomb pumped storage station[J]. Electric Power, 1999,32(11):48-51. |