[1] 李澍森,杨迎建,吴夕科,等. 配电技术概况及发展趋势[J]. 高电压技术,2008,34(1):113-122. LI Shusen, YANG Yingjian, WU Xike, et al . Overview and development trend of distribution technology[J]. High Voltage Engineering, 2008, 34(1): 113-122. [2] 李智宇,陈建福,张尧. 基于优化分区的配电网规划研究及实践[J]. 广西电力,2006,29(4):1-4. LI Zhiyu, CHEN Jianfu, ZHANG Yao. Study and practice about distribution network planning based on optimal partitioning[J].Guangxi Electric Power, 2006, 29(4): 1-4. [3] 李儒,钟庆,孔德键,等. 城网规划负荷地理分布预测[J]. 广东电力,2001,14(1):5-7. LI Ru, ZHONG Qing, KONG Dejian, et al . Spatial load forecasting for urban power network planning[J]. Guangdong Electric Power, 2001, 14(1): 5-7. [4] 钟庆,吴捷,伍力,等. 基于系统动力学的分区负荷预测[J]. 电网技术,2001,25(3):51-55. ZHONG Qing, WU Jie, WU Li, et al . Subarea load forecasting based on system dynamics[J]. Power System Technology, 2001, 25(3): 51-55. [5] 宋蒙. 基于GIS的城市配电网分区与网架优化规划[D]. 西安理工大学,2006. [6] 孔涛,程浩忠,王建民,等. 城市电网网架结构与分区方式的两层多目标联合规划[J]. 中国电机工程学报,2009,29(10):59-66. KONG Tao, CHENG Haozhong, WANG Jianmin, et al . United urban power grid planning for network structure and partition scheme based on bi-level multi-objective optimization with genetic algorithm [J]. Proceedings of the CSEE, 2009, 29(10): 59-66. [7] 李国庆,王成山,余贻鑫. 大型互联电力系统区域间功率交换能力研究综述[J]. 中国电机工程学报,2001,21(4):20-25. LI Guoqing, WANG Chengshan, YU Yixin. A survey on transmission transfer capability of interconnected electric power systems[J]. Proceedings of the CSEE, 2001, 21(4): 20-25. [8] Force Transmission Transfer Capability Task. Available transmission capability definitions and determination[J]. North American Reliability Council, Princeton, New Jersey, 1996. [9] Yan O, Singh C. Assessment of available transfer capability and margins [J]. IEEE Trans on Power System, 2002, 17(2): 463-468. [10] 陈浩. 配电网供电能力的计算方法研究[D]. 上海:上海交通大学,2009. [11] 肖峻,谷文卓,郭晓丹,等. 配电系统供电能力模型[J]. 电力系统自动化,2011,35(24):47-52. XIAO Jun, GU Wenzhuo, GUO Xiaodan, et al . A new model for supply capability in distribution systems[J]. Automation of Electric Power Systems, 2011, 35(24): 47-52. |