中国电力 ›› 2019, Vol. 52 ›› Issue (7): 132-140.DOI: 10.11930/j.issn.1004-9649.201805184

• 发电 • 上一篇    下一篇

提升调峰能力的机组供热改造方式优化研究

宋崇明, 徐彤, 田雪沁, 王新雷   

  1. 国网经济技术研究院有限公司, 北京 102209
  • 收稿日期:2018-05-28 修回日期:2018-12-28 出版日期:2019-07-05 发布日期:2019-07-13
  • 作者简介:宋崇明(1989-),男,硕士,工程师,从事可再生能源消纳相关研究,E-mail:songchm_001@163.com;徐彤(1968-),女,硕士,高级工程师(教授级),从事可再生能源消纳相关研究,E-mail:xutong1018@sohu.com;田雪沁(1985-),男,硕士,高级工程师,从事可再生能源消纳相关研究,E-mail:tianxueqin@chinasperi.sgcc.com.cn;王新雷(1969-),男,硕士,高级工程师(教授级),从事可再生能源消纳相关研究,E-mail:wxlchp@163.com
  • 基金资助:
    国家电网有限公司科技项目(B3441216K005)。

Optimization and Operation Research on the Unit Heating Retrofit to Improve Peak-Load Regulation Capability

SONG Chongming, XU Tong, TIAN Xueqin, WANG Xinlei   

  1. State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102209, China
  • Received:2018-05-28 Revised:2018-12-28 Online:2019-07-05 Published:2019-07-13
  • Supported by:
    This work is supported by Science and Technology Project of SGCC (No.B3441216K005).

摘要: 三北地区风电装机容量大,同时供热机组占比高,供热期风电和供热机组运行矛盾突出。三北地区供热改造机组规模大,未来其容量将会进一步增长,研究供热改造机组的调峰能力对促进可再生能源消纳、热电产业健康发展具有重要的意义。对抽汽供热、高背压供热、耦合热泵供热改造机组进行调峰特性分析,以某300 MW 供热改造机组为例进行调峰能力计算,对提升调峰能力的几种供热改造方式优化进行探讨,结果表明,供热改造方式优化在保证供热需求的前提下,可有效提高系统的调峰能力、促进可再生能源消纳。

关键词: 供热改造, 调峰, 300 MW机组, 可再生能源消纳

Abstract: In the Three-North Areas of China, due to the large amount of installed capacity of wind power and the high proportion of heating units, there has been outstanding conflict between the operations of wind power generators and heating units during the heating season. Considering the large scale of the heating units to be renovated and their future capacity growth, it is of great significance to study the peak-load regulation capability of the heating retrofit unit to promote the sound development of renewable energy absorption and thermoelectric industry. In this paper, the peak-load regulation performance analysis on the retrofit of several mainstream heating units, such as extraction steam retrofit units, high back pressure heating units and coupled heat pump heating units are carried out. The peak-load regulation capability of 300 MW class heating retrofit unit is calculated in the case studies. The optimization of different types of unit heating retrofit is then explored. The case studies show that, the corresponding optimization strategies can effectively improve the system peak-load regulation capability and promote renewable energy absorption with the demand of sufficient heating supply satisfied simultaneously.

Key words: unit heating retrofit, peak-load, 300 MW unit, renewable energy absorption

中图分类号: