1 000 MW二次再热超超临界机组分散控制系统关键技术研究及应用

黄焕袍1, 阳光2, 崔青汝3   

  1. 1. 北京国电智深控制技术有限公司 北京市电站自动化工程技术研究中心,北京 102200;
    2. 国电科技环保集团股份有限公司,北京 100039;
    3. 中国国电集团公司,北京 100034
  • 收稿日期:2017-03-20 出版日期:2017-06-20 发布日期:2017-07-12
  • 作者简介:黄焕袍(1964-),男,广西百色人,博士,高级工程师(教授级),从事控制理论、热工自动化技术研究与应用。E-mail: huanghuanpao@kh.cgdc.com.cn
  • 基金资助:
    国家科技支撑计划项目(2012BAA12B00)

The Development and Application of the Key DCS Technologies for 1 000-MW Double Reheat Ultra-Supercritical Units

HUANG Huanpao1, YANG Guang2, CUI Qingru3   

  1. 1. Beijing Engineering Research Center of Power Station Automation, Beijing Guodian Zhishen Control Technology Co., Ltd., Beijing 102200, China;
    2. Guodian Technology & Environment Group Corporation Ltd., Beijing 100039, China;
    3. China Guodian Corporation, Beijing 100034, China
  • Received:2017-03-20 Online:2017-06-20 Published:2017-07-12
  • Supported by:
    ; This work is supported by the National Key Technology Support Program (No. 2012BAA12B00).

摘要: 在分析二次再热机组控制难点的基础上,介绍了1 000 MW二次再热超超临界机组国产自主化分散控制系统关键技术的研发,包括机组分散控制系统的设计及技术特点,机组协调控制技术,汽温控制技术,旁路控制技术及机组自启停(APS)控制技术。示范工程的应用表明,该分散控制系统性能稳定可靠,各项性能指标达到或优于设计值,机组实现了启停全程控制自动化。

关键词: 燃煤发电, 1 000 MW, 超超临界机组, 二次再热循环, 分散控制系统, 机炉协调控制技术, 汽温控制技术, 三级旁路全程控制技术, 机组自启停技术(APS), 示范工程

Abstract: Based on the analysis of the difficulties in the control of double-reheat power generation units, the development of the key technologies of the distributed control system(DCS) for 1 000-MW double reheat ultra-supercritical(DRUSC) power generation units is presented, which involves the design and technical characteristics of DCS, the key control strategies and technologies for the coordinated control system, the steam temperature, the bypass system and the automatic plant startup and shutdown(APS). The application on the demonstration project shows that the performance of DCS is stable and reliable with the major indices meeting or better than the designed values. The whole-process automatic control from starting up to shutting down has been realized.

Key words: coal-fired power generation, 1 000 MW, ultra-supercritical unit, double reheat cycle, distributed control system (DCS), turbine-boiler coordinated control system (CCS), steam temperature control, three-stage bypass control, auto plant startup and shutdown (APS), demenstration power plant