[1] 国家能源局. 2017年上半年全国风电并网运行情况[R]. 2017. [2] 国家电网冀北电力调控分中心. 冀北电网2018年度运行方式分析报告[R]. 2018. [3] 舒印彪, 张智刚, 郭剑波, 等. 新能源消纳关键因素分析及解决措施研究[J]. 中国电机工程学报, 2017, 37(1):1-8 SHU Yinbiao, ZHANG Zhigang, GUO Jianbo, et al. Study on key factors and solution of renewable energy accommodation[J]. Proceedings of the CSEE, 2017, 37(1):1-8 [4] 裴哲义, 范高锋. 中国风电运行消纳相关问题研究[J]. 中国电力, 2017, 47(4):1-4 PEI Zheyi, FAN Gaofeng. Research on wind power operation and accommodation problems in China[J]. Electric Power, 2017, 47(4):1-4 [5] 张宁, 周天睿, 段长刚, 等. 大规模风电场接人对电力系统调峰的影响[J]. 电网技术, 2010, 34(1):152-158 ZHANG Ning, ZHOU Tianrui, DUAN Changang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(1):152-158 [6] 朱凌志, 陈宁, 韩华玲, 等. 风电消纳关键问题及应对措施分析[J]. 电力系统自动化, 2011, 35(22):29-34 ZHU Lingzhi, CHEN Ning, HAN Hualing, et al. Key problems and solutions of wind power accommodation[J]. Automation of Electric Power Systems, 2011, 35(22):29-34 [7] 国家发展和改革委员会. 河北省张家口市可再生能源示范区发展规划[R]. 2015. [8] 吴兴泉, 万秋兰. 盐城地区风电及光电特性研究[J]. 江苏电机工程, 2013, 32(4):1-5 WU Xingquan, WAN Qiulan. Study on the characteristics of wind power and photovoltaic power in Yancheng area[J]. Jiangsu Electrical Engineering, 2013, 32(4):1-5 [9] 姚天亮, 郑海涛, 杨德洲, 等. 甘肃河西500万kW光伏就地消纳及调峰分析[J]. 中国电力, 2014, 47(3):14-18 YAO Tianliang, ZHENG Haitao, YANG Dezhou, et al. Analysis on Local consumption and peaking issues of 5000 MW PV in Hexi area of Gansu province[J]. Electric Power, 2014, 47(3):14-18 [10] 贺静, 王维州, 牛继恩, 等. 甘肃省风电消纳能力研究[J]. 中国电业(技术版), 2012(3):39-42 HE Jin, WANG Weizhou, Niu Jien, et al. Study on the dissolving ability of wind power in Gansu[J]. China Electric Power (Technology Edition), 2012(3):39-42 [11] 程临燕, 冯艳虹, 王宁, 等. 京津及冀北电网负荷特性分析及调峰裕度计算[J]. 华北电力技术, 2015(11):1-6 CHENG Linyan, FENG Yanhong, WANG Ning, et al. Load characteristics analysis and peak margin calculation of Beijing-Tianjin-Northern Hebei Power Grid[J]. North China Electric Power, 2015(11):1-6 [12] 韩小琪, 孙寿广, 戚庆茹. 从系统调峰角度评估电网接纳风电能力[J]. 中国电力, 2010, 43(6):16-19 HAN Xiaoqi, SUN Shouguang, QI Qingru. Evaluation of wind power penetration limit from peak regulation[J]. Electric Power, 2010, 43(6):16-19 [13] 赵娟, 王雷, 吴磊. 陕西电网调峰能力及可接纳新能源能力研究[J]. 电力科学与工程, 2015, 31(11):24-29 ZHAO Juan, WANG Lei, WU Lei. Study on peak regulation capacity and consumptive ability of wind and photovoltaic power of Shaanxi power grid[J]. Electric Power Science and Engineering, 2015, 31(11):24-29 [14] 郭旭阳, 谢开贵, 胡博, 等. 计入光伏发电的电力系统分时段随机生产模拟[J]. 电网技术, 2013, 37(6):1499-1505 GUO Xuyang, XIE Kaigui, HU Bo, et al. A time-interval based probabilistic production simulation of power system with grid-connected photovoltaic generation[J]. Power System Technology, 2013, 37(6):1499-1505 [15] 姚天亮, 吴兴全, 李志伟, 等. 计及多约束条件的风光互补容量配比研究[J]. 电力系统保护与控制, 2017, 45(9):126-132 YAO Tianliang, WU Xingquan, LI Zhiwei, et al. Research on complementary capacity ratio of wind power and photovoltaic considering multiple constraints[J]. Power System Protection and Control, 2017, 45(9):126-132 [16] 徐林, 黄晓莉, 杜忠明, 等. 适应新能源发展的电力规划方法研究[J]. 中国电力, 2017, 50(9):18-24 Xu Lin, Huang Xiaoli, Du Zhongming, et al. Study on power system planning method adapting to new energy developmen[J]. Electric Power, 2017, 50(9):18-24 |