[1] 赵洪宇,尹峰,顾正皓,等. 电网线路过载速减机组出力控制[J]. 中国电力,2011,44(10):64-68. ZHAO Hong-yu, YIN Feng, GU Zheng-hao, et al . Fast load- shedding control for line overload of power grid [J]. Electric Power, 2011, 44(10): 64-68. [2] 李响,郭志忠. 基于 N -1静态安全约束的输电断面有功潮流控制[J]. 中国电力,2005,38(3):25-28. LI Xiang, GU0 Zhi-zhong. The transmission interface real power flow control based on N -1 static state safety restriction [J].Electric Power, 2005, 38(3): 25-28. [3] 吴旭涛,艾绍贵,樊益平,等. LGJQ-400型导线过载能力的现场试验研究[J]. 宁夏电力,2009(4):36-39. WU Xu-tao, AI Shao-gui, FAN Yi-ping, et al . The field test of the over loading capacity for the type of LGJQ-400 transmission line [J]. Ningxia Electric Power, 2009(4): 36-39. [4] 闫培丽,王红晋,郭亚昌,等. 电流互感器、电压互感器二次参数选择问题研究[J]. 中国电力,2009,42(6):55-59. YAN Pei-li, WANG Hong-jin, GUO Ya-chang, et al . Research on selection of secondary parameter of current transformer and voltage transformer [J]. Electric Power, 2009, 42(6): 55-59. [5] 朱介南,吴永存,罗韶辉,等. 1 000 MW机组停机不停炉功能的设计和应用[J]. 中国电力,2010,43(8):18-21. ZHU Jie-nan, WU Yong-cun, LUO Shao-hui, et al . Design & application on the function of boiler no tripping after turbine tripping in 1 000 MW unit [J]. Electric Power, 2010, 43(8): 18-21. [6] 郑赟. 印度工程汽轮机旁路容量的选型设计[J]. 热力透平,2012,41(3):209-214. ZHENG Yun. Turbine bypass capacity design of power plant in India [J]. Thermal Turbine, 2012, 41(3): 209-214. [7] 朱北恒,尹峰,何畅,等. 火电机组RB试验等效性研究[J]. 浙江电力,2008,27(2):9-12. ZHU Bei-heng, YIN Feng, HE Chang, et al . Research of equivalence relation for RB test in fossil fuel power units[J].Zhejiang Electric Power, 2008, 27(2): 9-12. [8] 尹峰,朱北恒,项谨,等. 火电机组全工况自动RB控制策略的研究与应用[J]. 浙江电力,2008,27(4):5-8. YIN Feng, ZHU Bei-heng, XIANG Jin, et al . Research and application of full-scale automatic RB control strategy in thermal power units [J]. Zhejiang Electric Power, 2008, 27(4): 5-8. [9] 朱北恒. RB控制技术试验研究[J]. 中国电力,2004,37(6):67-70. ZHU Bei-heng. The test and research for RB control technology[J]. Electric Power, 2004, 37(6): 67-70. [10] 姚金环. 对FCB若干问题的探讨[J]. 中国电力,2007,40(5):59-62. YA0 Jin-huan. Discussion on several issues concerning FCB [J].Electric Power, 2007, 40(5): 59-62. [11] 陈又申,余正环. 电网故障与火电厂机组控制应对[J]. 中国电力,2005,35(5):71-73. CHEN You-shen, YU Zheng-huan. Countermeasures against power system failure for control of thermal power plants[J]. Electric Power, 2005, 35(5): 71-73. |