[1] 张伟波,潘宇超,崔志强,等. 我国天然气发电存在问题及对策建议[J]. 能源技术经济,2012,24(3):15-17. ZHANG Wei-bo, PAN Yu-chao, CUI Zhi-qiang, et al . China’s natural gas power generation industry: problems and solutions [J]. Energy Technology and Economics, 2012, 24(3): 15-17. [2] 陈亮,李嘉龙,武小梅,等. 广东电网天然气发电的相关问题及对策[J]. 中国电力,2011,44(9):76-79. CHEN Liang, LI Jia-long, WU Xiao-mei, et al . Natural gas power generation related problems and its countermeasures for Guangdong power grid[J]. Electric Power, 2011, 44(9): 76-79. [3] 董军,阴少华,王江波,等. 基于随机生产模拟的天然气发电环境效益与可靠性效益分析[J]. 陕西电力,2010(7):21-24,28. DONG Jun, YIN Shao-hua, WANG Jiang-bo, et al . Analysis on environment & reliability benefits of natural gas generation based on stochastic production simulation[J]. Shaanxi Electric Power,2010(7): 21-24, 28. [4] 周志伟. 燃气电价政策及燃机电厂的发电策略[J]. 电力与能源, 2011,32(2):98-100. ZHOU Zhi-wei. Gas price policy and strategy of gas turbine power plant [J]. Power and Energy, 2011, 32(2): 98-100. [5] 冀巨海,梁微. 基于ISM模型的煤层气电厂项目风险因素分析[J]. 山西农业大学学报:自然科学报,2012,11(4):376-382. JI Ju-hai, LIANG Wei. Analysis on project risk factors of coal-bed methane power plant with ISM model[J]. Journal of Shanxi Agriculture University: Natural Science Edition, 2012, 11(4): 376-382. [6] 黄粲然,张士杰,王 波,等. 燃气轮机发电机组投资成本模型[J]. 燃气轮机技术,2010,23(2):17-24. HUANG Can-ran, ZHANG Shi-jie, WANG Bo, et al . Investment cost model of gas turbine generating unit[J]. Gas Turbine Technology, 2010, 23(2): 17-24. [7] “十二五”及中长期电力发展研究[R]. 北京:国网能源研究院,2010. |