[1] 郦建国,龙辉,郦祝海,等. 低低温电除尘技术研究及应用[C]//第十五届中国电除尘学术会议论文集. 2013. [2] YOSHIO Nakayama, SATOSHI Nakamura, YASUHIRO Takeuchi, et al . MHI high efficiency system-proven technology for multi pollutant removal[R]. Hiroshima Research & Development Center, 2011: 1-11. [3] MASAMI Kato, TADASHI Tanaka, YASUKI Nishimura, et al . Method and system for handling exhaust gas in a boiler: USA 5282429[P]. 1994-02-1. [4] 土屋喜重,川西好光,大西召一,等. Very cold electrostatic technology of advanced flue gas treatment system for coal-fired boiler [J]. 三菱重工技报,1997,34(3):158-161. [5] 柳生隆志,土屋喜重,大西召一,等. Recent electrostatic precipitation technology [J]. 三菱重工技报,1996,33(1):69-73. [6] Development and demonstration of waste heat integration with solvent process for more efficient CO 2 removal from coal-fired flue gas [R]. Project Review Meeting.: Southern Company, 2012. [7] 柴田宪司,三重野光博,山本卓也. 電気集塵方法[P]. 三菱重工技报,2000. [8] TOSHIAKI Misaka, YOSHIHIKO Mochizuki. Recent application and running cost of moving electrode type electrostatic precipitator [C]//11th International Conference on Electrostatic Precipitation. 2008: 518-522. [9] STEPHENL Francis, ANDREAS Back, PER Johansson. Reduction of rapping losses to improve ESP performance [C]//11th International Conference on Electrostatic Precipitation. 2008: 45-49. [10] 森雄介,積田佳満,松本有夫,等. Operation results of IHI flue gas desulfurization system-unit No.1 (1 000 MW) of Hitachinaka thermal power station for Tokyo Electric Power Co., Inc. [J] . 石川島播磨技報,2005,45(1):30-35. [11] MORI Yusuke, TSUMITA Yoshimitsu, MATSUMOTO Ario, et al . Operation results of IHI flue gas desulfurization system-unit No.1(1 000 MW) of Hitachinaka thermal power station for TEPCO [J]. IHI Engineering Review, 2006, 39(1): 22-26. [12] ANDREAS Back. Enhancing ESP efficiency for high resistivity fly ash by reducing the flue gas temperature [C]//11th International Conference on Electrostatic Precipitation. 2008: 406-411. [13] 藤岛英胜,土屋喜重,西田定二,等. Rationalized design of total flue gas treatment system for coal-fired boiler by application of colder ESP [J]. 三菱重工技报,1994,31(4):247-251. |