journal1 ›› 2015, Vol. 48 ›› Issue (1): 15-20.DOI: 10.11930/j.issn.10.11930.2015.1.15

• 16th Five-Year Power Planning • Previous Articles     Next Articles

Research on Power Flow and Power Source Installation Planning Scheme during the 13th Five-Year Period

BAI Jianhua, YAN Xiaoqing, CHENG Lu   

  1. State Grid Energy Research Institution, Beijing 102209, China
  • Received:2014-12-14 Online:2015-11-24 Published:2015-11-25

Abstract: The period of the 13th Five-Year(2016-2020) is an important opportunity period for the state’s energy and power industry to change its developing mode and optimize its structure and layout. Under the new circumstances of continuous growth of electricity demands, more strict constraints on ecological environmental capacity and large-scaled renewable energy exploitation of wind power and solar power etc., it is inevitable to optimize the allocation of energy in a wider range. Reasonable and scientific power flow planning turns out to be of the most importance. Therefore, a new method of power flow planning applicable to the current situation is proposed in this paper. Based on this new method, the nationwide power flow planning for the 13th Five-Year period is conducted, which can bring forth remarkable social and economic benefits.

Key words: energy resources, electric power, the 13th Five-Year(2016-2020), power flow planning, power source planning, social and economic benefits

CLC Number: