Electric Power ›› 2023, Vol. 56 ›› Issue (1): 38-48.DOI: 10.11930/j.issn.1004-9649.202210063
• Electricity Price Marketization Reform and Price Supervision • Previous Articles Next Articles
LI Xudong1, YANG Ye1, LI Fanqi1, SHI Quanyou2, TAN Zhongfu1
Received:2022-10-17
Revised:2022-12-12
Accepted:2023-01-15
Online:2023-01-23
Published:2023-01-28
Supported by:LI Xudong, YANG Ye, LI Fanqi, SHI Quanyou, TAN Zhongfu. Business Models of Electric Vehicle Aggregators Considering Electricity Price Uncertainty and Capacity Decay[J]. Electric Power, 2023, 56(1): 38-48.
| [1] 侯慧, 王逸凡, 赵波, 等. 价格与激励需求响应下电动汽车负荷聚集商调度策略[J]. 电网技术, 2022, 46(4): 1259–1269 HOU Hui, WANG Yifan, ZHAO Bo, et al. Electric vehicle aggregator dispatching strategy under price and incentive demand response[J]. Power System Technology, 2022, 46(4): 1259–1269 [2] 张晶. 产业链视角下电动汽车充电基础设施商业模式对比研究[D]. 北京: 北京交通大学, 2019. ZHANG Jing. Comparison research on the business model of electric vehicles charging infrastructure in the view of industry chain[D]. Beijing: Beijing Jiaotong University, 2019. [3] KLEY F, LERCH C, DALLINGER D. New business models for electric cars-a holistic approach[J]. Energy Policy, 2011, 39(6): 3392–3403. [4] 项顶, 胡泽春, 宋永华, 等. 通过电动汽车与电网互动减少弃风的商业模式与日前优化调度策略[J]. 中国电机工程学报, 2015, 35(24): 6293–6303 XIANG Ding, HU Zechun, SONG Yonghua, et al. Business model and day-ahead dispatch strategy to reduce wind power curtailment through vehicle-to-grid[J]. Proceedings of the CSEE, 2015, 35(24): 6293–6303 [5] 白婧萌. 电动汽车充电的商业运营模式设计及评价[D]. 北京: 华北电力大学, 2018. BAI Jingmeng. Design and comprehensive evaluation of commercial operation modes for electric vehicle charging[D]. Beijing: North China Electric Power University, 2018. [6] 刘敦楠, 王梅宝, 李根柱, 等. 电动汽车参与电力市场的商业运营模式研究[J]. 全球能源互联网, 2019, 2(5): 516–524 LIU Dunnan, WANG Meibao, LI Genzhu, et al. Business model for optimal electric vehicle participation in electricity market[J]. Journal of Global Energy Interconnection, 2019, 2(5): 516–524 [7] 蔡海青, 代伟, 赵静怡, 等. 基于多参数规划的电动汽车充电站有效容量评估方法[J]. 中国电力, 2022, 55(11): 175–183 CAI Haiqing, DAI Wei, ZHAO Jingyi, et al. Available capacity evaluation method of electric vehicle charging stations based on multi-parametric programming[J]. Electric Power, 2022, 55(11): 175–183 [8] 刘维扬, 王冰, 王敏, 等. 智能合约技术下电动汽车入网竞价机制研究[J]. 电网技术, 2019, 43(12): 4344–4352 LIU Weiyang, WANG Bing, WANG Min, et al. Research on electric vehicles participating in bidding mechanism of power grid based on smart contract technology[J]. Power System Technology, 2019, 43(12): 4344–4352 [9] 王敏, 吕林, 向月. 计及V2G价格激励的电动汽车削峰协同调度策略[J]. 电力自动化设备, 2022, 42(4): 27–33, 85 WANG Min, LÜ Lin, XIANG Yue. Coordinated scheduling strategy of electric vehicles for peak shaving considering V2G price incentive[J]. Electric Power Automation Equipment, 2022, 42(4): 27–33, 85 [10] 张谦, 史乐峰, 任玉珑, 等. 计及V2G备用服务的交易模式[J]. 中国电机工程学报, 2012, 32(31): 59–67, 219 ZHANG Qian, SHI Lefeng, REN Yulong, et al. The reserve trading model considering vehicle-to-grid reserve[J]. Proceedings of the CSEE, 2012, 32(31): 59–67, 219 [11] 杨捷, 曹子健. 电动汽车储能V2G模式的成本与收益分析[J]. 储能科学与技术, 2020, 9(增刊1): 45–51 YANG Jie, CAO Zijian. Cost and benefit analysis of EV energy storage through V2G[J]. Energy Storage Science and Technology, 2020, 9(S1): 45–51 [12] 吴洲洋, 艾欣, 胡俊杰. 电动汽车聚合商参与调频备用的调度方法与收益分成机制[J]. 电网技术, 2021, 45(3): 1041–1050 WU Zhouyang, AI Xin, HU Junjie. Dispatch and income distribution of electric vehicle aggregator’s participation in frequency regulation[J]. Power System Technology, 2021, 45(3): 1041–1050 [13] 王子石, 杨知方, 杨燕, 等. 考虑电价不确定性的负荷价–量曲线聚合方法[J]. 中国电机工程学报, 2021, 41(1): 147–155, 405 WANG Zishi, YANG Zhifang, YANG Yan, et al. Bidding curve aggregation considering uncertainty of electricity price[J]. Proceedings of the CSEE, 2021, 41(1): 147–155, 405 [14] 杜佳男, 韩肖清, 李廷钧, 等. 考虑电价不确定性和博弈欺诈行为的多微网电能合作运行优化策略[J]. 电网技术, 2022, 46(11): 4217–4230 DU Jianan, HAN Xiaoqing, LI Tingjun, et al. Optimization strategy of multi-microgrid electric energy cooperative operation considering electricity price uncertainty and game cheating behaviors[J]. Power System Technology, 2022, 46(11): 4217–4230 [15] 刘向军, 牟明亮, 黄绍模, 等. 考虑充电功率衰减的电动汽车两阶段优化调度策略[J]. 电网技术, 2021, 45(7): 2656–2666 LIU Xiangjun, MU Mingliang, HUANG Shaomo, et al. Two-stage optimal scheduling strategy of electric vehicle considering charging power decay[J]. Power System Technology, 2021, 45(7): 2656–2666 [16] 杨洁, 王国胤, 刘群, 等. 正态云模型研究回顾与展望[J]. 计算机学报, 2018, 41(3): 724–744 YANG Jie, WANG Guoyin, LIU Qun, et al. Retrospect and prospect of research of normal cloud model[J]. Chinese Journal of Computers, 2018, 41(3): 724–744 [17] 汪元芹, 刘敏. 考虑现货电价及分布式电源不确定性的售电商购售电决策模型[J]. 电力科学与工程, 2021, 37(11): 62–71 WANG Yuanqin, LIU Min. Electricity purchase and sale decision modelling for electricity retailers considering the uncertainty of spot electricity price and distributed power generation[J]. Electric Power Science and Engineering, 2021, 37(11): 62–71 [18] 车百智库, 自然资源保护协会. 车网协同能力建设指南[R]. [19] 关立, 周蕾, 刘航航, 等. 独立储能电站参与电力现货市场机制及试运行分析[J]. 中国电力, 2022, 55(10): 185–190 GUAN Li, ZHOU Lei, LIU Hanghang, et al. Mechanism and trial operation analysis of independent energy storage power station participating in spot electricity market[J]. Electric Power, 2022, 55(10): 185–190 [20] 庄晓丹, 刘卫东, 黄为群, 等. 浙江电力现货市场环境下储能的市场交易机制与效益分析[J]. 中国电力, 2022, 55(6): 80–85 ZHUANG Xiaodan, LIU Weidong, HUANG Weiqun, et al. Energy storage market trading mechanism and benefit analysis of Zhejiang power spot market[J]. Electric Power, 2022, 55(6): 80–85 [21] 阎洁, 许成志, 刘永前, 等. 基于风速云模型相似日的短期风电功率预测方法[J]. 电力系统自动化, 2018, 42(6): 53–59 YAN Jie, XU Chengzhi, LIU Yongqian, et al. Short-term wind power prediction method based on wind speed cloud model in similar day[J]. Automation of Electric Power Systems, 2018, 42(6): 53–59 [22] 王泽爽, 陈嘉俊, 朱建全, 等. 计及循环寿命的储能优化配置与运营策略[J]. 电力自动化设备, 2021, 41(10): 75–81 WANG Zeshuang, CHEN Jiajun, ZHU Jianquan, et al. Optimal configuration and operation strategy of energy storage considering cycle life[J]. Electric Power Automation Equipment, 2021, 41(10): 75–81 [23] 肖迁, 焦志鹏, 穆云飞, 等. 基于LightGBM的电动汽车行驶工况下电池剩余使用寿命预测[J]. 电工技术学报, 2021, 36(24): 5176–5185 XIAO Qian, JIAO Zhipeng, MU Yunfei, et al. LightGBM based remaining useful life prediction of electric vehicle lithium-ion battery under driving conditions[J]. Transactions of China Electrotechnical Society, 2021, 36(24): 5176–5185 [24] 刘一欣, 郭力, 王成山. 微电网两阶段鲁棒优化经济调度方法[J]. 中国电机工程学报, 2018, 38(14): 4013–4022,4307 LIU Yixin, GUO Li, WANG Chengshan. Economic dispatch of microgrid based on two stage robust optimization[J]. Proceedings of the CSEE, 2018, 38(14): 4013–4022,4307 [25] 章枫, 房乐, 陆承宇, 等. 计及电池寿命的储能参与调频市场收益分析[J]. 浙江电力, 2021, 40(12): 61–68 ZHANG Feng, FANG Le, LU Chengyu, et al. Market returns analysis of energy storage participating in frequency regulation considering battery life[J]. Zhejiang Electric Power, 2021, 40(12): 61–68 [26] 李柯江, 宋天昊, 韩肖清, 等. 计及电价不确定性和损耗成本的储能竞价策略[J]. 电力系统自动化, 2020, 44(17): 52–59 LI Kejiang, SONG Tianhao, HAN Xiaoqing, et al. Bidding strategy of energy storage considering electricity price uncertainty and loss cost[J]. Automation of Electric Power Systems, 2020, 44(17): 52–59 |
| [1] | DING Yi, WANG Chunliang, XI Yuewei, HU Wenyan, YANG Zhiping, GUO Xiyan. Revenue calculation for 630 MW supercritical steam-supply combined heat and power unit [J]. Electric Power, 2026, 59(1): 76-83. |
| [2] | WANG Jiang, CHEN Xiaodong, XU Zhe, WANG Jingliang, WANG Lipeng. An optimization method for imbalance funds in a multi-agent game-theoretic electricity market [J]. Electric Power, 2026, 59(1): 153-162. |
| [3] | WU Wenzu, WANG Xuhui, LU Yuan, CHEN Wan, TIAN Shijin, CHEN Xian. A Forecast Method for Electricity Spot Market Clearing Prices Based on Fractal Theory [J]. Electric Power, 2025, 58(9): 183-193. |
| [4] | SHANG Jingyi, ZHANG Yihan, YANG Fuwang, XIANG Mingxu. Impacts and Countermeasures of Generators' Strategic Bidding on Inter-Provincial and Intra-Provincial Spot Markets [J]. Electric Power, 2025, 58(11): 1-13. |
| [5] | SONG Zhuoran, ZHANG Yanni, WANG Yang, JIANG Haiwei, LI Jiayu, GAO Hongchao. Impacts of Diverse Operational Modes and Flexibility of Distributed Energy Systems within Electricity Market [J]. Electric Power, 2025, 58(11): 111-121. |
| [6] | Xiangguang LI, Qingbo TAN, Fanqi LI, Xudong LI, Zhongfu TAN. Analysis Model to Study the Influence of Electrocarbon Coupling on Settlement Price of Coal Power Units in Spot Market [J]. Electric Power, 2024, 57(5): 113-125. |
| [7] | Yi QI, Jing ZHANG, Jing LIU, Shengnan WEI, Yanling WANG, Zhaohao DING. A Spot Price Limit Adaptive Model Considering the Impact Layer Under the Risk of New Energy Entering the Market [J]. Electric Power, 2024, 57(11): 94-101. |
| [8] | WU Di, WANG Zhengfeng, GAO Weiheng, YING Yiqiang. Research on Power Grid Security Check for Provincial Electricity Spot Market [J]. Electric Power, 2023, 56(9): 57-65. |
| [9] | XU Ling, ZHANG Xipeng, CAO Yiqi, ZHANG Bingjin, DONG Cheng, TAN Zhenfei. Clearing Model for Inter-provincial Spot Electricity and Reserve Coupling Considering Reserve Sharing [J]. Electric Power, 2023, 56(9): 48-56. |
| [10] | ZHUANG Xiaodan, LIU Weidong, HUANG Weiqun, DENG Hui, WANG Wei. Energy Storage Market Trading Mechanism and Benefit Analysis of Zhejiang Power Spot Market [J]. Electric Power, 2022, 55(6): 80-85. |
| [11] | ZHANG Mingli, ZHANG Na, WU Zhikai, GAO Jing, XU Xilin, LI Jian, LV Quan. Joint Clearing Model of Day-Ahead Energy Market and Down Regulation Service Market for Accommodation of Renewable Energy [J]. Electric Power, 2022, 55(2): 138-144. |
| [12] | GUAN Li, ZHOU Lei, LIU Hanghang, ZHOU Xinsheng, TAO Wei, ZHAO Zizhou. Analysis of Independent Energy Storage Power Station Participating in Power Spot Market Mechanism and Trial Operation [J]. Electric Power, 2022, 55(10): 185-190. |
| [13] | XU Yun. The Decision Making Process of an Electricity Retailer Under Medium and Long Term Restriction in Spot Market [J]. Electric Power, 2021, 54(6): 79-85. |
| [14] | GAN Zishen, JING Zhaoxia, XIE Wenjin, LIU Yu, PAN Zhanhua. Financial Transmission Right Mechanism and Its Application in China Electricity Market [J]. Electric Power, 2021, 54(6): 54-61. |
| [15] | LENG Yuan, GU Weide. Operating Mechanism of Australian Electric Financial Derivatives Market and Its Implications for Electricity Market Construction in China [J]. Electric Power, 2021, 54(6): 36-43,61. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||
