[1] 哈尔滨汽轮机厂有限责任公司相关技术说明[R]. 哈尔滨:哈尔滨汽轮机厂,2015. [2] 东方汽轮机厂. N1000-25.0/600/600型汽轮机运行说明书[R]. 绵阳:东方汽轮机厂,2010. [3] 李志龙,李艳超,于海东,等. 某型1 000 MW汽轮机汽流激振解决对策研究[J]. 中国电力,2015,48(5):36-40. LI Zhilong, LI Yanchao, YU Haidong, et al. The steam flow excited vibration countermeasures of 1 000 MW steam turbine [J]. Electric Power, 2015, 48(5): 36-40. [4] 何国安,常屹,张学延,等. 预负荷调整在可倾瓦轴承不稳定振动处理中的应用[J]. 中国电力,2012,45(11):36-40. HE Guoan, CHANG Yi, ZHANG Xueyan, et al. Application of preload factor to eliminating unstable vibration of tilting pad bearings [J]. Electric Power, 2012, 45(11): 36-40. [5] 张学延,张卫军,葛祥,等. 西门子技术1 000 MW超超临界机组轴系振动问题[J]. 中国电力,2012,45(5):68-72. ZHANG Xueyan, ZHANG Weijun, GE Xiang, et al. Vibration of turbine shafting in 1 000 MW ultra supercritical unit with Siemens technology [J]. Electric Power, 2012, 45(5): 68-72. [6] 史进源,孙庆,危奇,等. 超超临界汽轮机汽流激振的研究[J]. 动力工程,2003,23(5):2620-2623. SHI Jinyuan, SUN Qing, WEI Qi, et al. Research on the steam- excited vibration of ultra supercritical steam turbines[J]. Power Engineering, 2003, 23(5): 2620-2623. [7] 张卫军,陈胜军,张学延,等. 某台超超临界1 000 MW机组振动故障诊断与治理[J]. 热力发电,2012,41(2):64-67. ZHANG Weijun, CHEN Shengjun, ZHANG Xueyan, et al. Diagnosis and remedy of the vibration fault for ultra-supercritical 1 000 MW unit [J]. Thermal Power Generation, 2012, 41(2): 64-67. [8] 张学延,王延博,张卫军. 大型汽轮机汽流激振问题的分析和处理[J]. 热力发电,2004(2):47-55. ZHANG Xueyan, WANG Yanbo, ZHANG Weijun. Analysis and treatment for problem concerning steam flow exciting vibration on domestic large-scale steam turbines [J]. Thermal Power Generation, 2004(2): 47-55. [9] 沈士一,庄贺庆,康松,等. 汽轮机原理[M]. 北京:中国电力出版社,1992. [10] 何国安,陈强,甘文亮,等. 1 000 MW机组振动特性及案例分析[J]. 中国电力,2013,46(10):27-31. HE Guoan, CHEN Qiang, GAN Wenliang, et al. Analysis and case study on vibration characteristics of 1 000 MW units [J]. Electric Power, 2013, 46(10): 27-31. [11] 张学延. 汽轮发电机组振动诊断[M]. 北京:中国电力出版社,2008. [12] 纪云松. 某电厂1 000 MW发电机组#7瓦振动分析[J]. 华电技术,2015,37(4):43-44. JI Yunsong. Analysis on vibration of bearing bush No.7 of 1 000 MW generator set in a power plant [J]. Huadian Technology, 2015, 37(4): 43-44. [13] 樊庆林,乔宏伟. 300 MW空冷汽轮机回热系统的优化选择[J]. 汽轮机技术,2003,45(1):29-30,57. FAN Qinglin, QIAO Hongwei. Optimization of regeneration extraction cycle for 300 MW air-cooling turbine[J]. Turbine Technology, 2003, 45(1): 29-30, 57. [14] 李传胜,聂鑫. 二次再热汽轮机回热系统配置方案探讨[J]. 汽轮机技术,2015,57(3):181-184. LI Chuansheng, NIE Xin. Double reheat turbine heat recovery system setup program analysis [J]. Turbine Technology, 2015, 57(3): 181-184. |