[1] CSG 114002—2011 电力设备预防性试验规程 [S]. [2] 樊红宇,方小春. 500 kV主变压器系统电气设备不拆高压引线试验方法[J]. 江西电力,2010,34(5):23-27. FAN Hong-yu, FANG Xiao-chun. Test without disconnecting high-voltage leads on 500 kV main transformer electrical equipment [J]. Jiangxi Electric Power, 2010, 34(5): 23-27. [3] 李顺尧. 220 kV变压器不拆线预试方法探讨[J]. 广东输电与变电技术,2011,13(1):15-18. LI Shun-yao. Discussion on 220 kV transformer preventive testing without disconnecting the lead-wire[J]. Guangdong Power Transmission Technology, 2011, 13(1): 15-18. [4] 赵智大. 高电压技术[M]. 北京:中国电力出版社,2006:53-55,81-82,214-215. [5] 姚玉斌,吴志良,王丹,等. 电力系统变压器模型分析[J]. 继电器,2007,35(24):16-20. YAO Yu-bin, WU Zhi-liang, WANG Dan, et al . Study on transformer representation in power system[J]. Relay, 2007, 35(24): 16-20. [6] 邱关源. 电路[M]. 北京:高等教育出版社,2006:69-71,82-85. [7] 欧小冬,王艳萍. 新型AI-6000(E)型高压智能介损测试仪及其应用[J]. 自动化应用,2010(9):64-68. OU Xiao-dong, WANG Yan-ping. New intelligent AI-6000(E) HV dielectric loss tester and its application[J]. Automation Application, 2010(9): 64-68. [8] 王身丽,韩浩,翁永春. 500 kV架空输电线路感应电仿真计算方法[J]. 湖北电力,2009,33(5):40-41,55. WANG Shen-li, HAN Hao, WENG Yong-chun. Calculation of induced voltage by simulation method in 500 kV transmission line [J]. Hubei Electric Power, 2009, 33(5): 40-41, 55. |