Electric Power ›› 2016, Vol. 49 ›› Issue (8): 21-25.DOI: 10.11930/j.issn.1004-9649.2016.08.021.05

• Power System • Previous Articles     Next Articles

Impacts of Operation of 750 kV Yili-Kuche Power Transmission Line on Security and Stability of Xinjiang Power Grid

LI Xiaojun1, ZHANG Zhiqiang1, ZHENG Chao1, LV Pan2, ZHOU Zhuan2, CHANG Xiqiang3, WANG Heng3   

  1. 1. China Electric Power Research Institute, Beijing 100192, China;
    2. State Grid Xinjiang Economic Research Institute,Urumqi 830016, China;
    3. Xinjiang Communication Center for Power Dispatching, Urumqi 830002, China
  • Received:2016-03-08 Online:2016-08-10 Published:2016-08-12
  • Contact: This work is supported by Science and Technology Program of State Grid Corporation of China (No. XT71-13-037).

Abstract: The 750 kV Xinjiang Yili-Kuche power transmission and transformation project will form the Tianshan western section of a large ring network after completion and being put into operation in 2016. A calculation and analysis is made on the Xinjiang power grid before and after operation of the Yili-Kuche Line in terms of power flow distribution, safety and stability level, short-circuit current level and small disturbance stability. And the effects of the operation of Yili-Kuche line on the transmission capacity of key sections are studied. Calculation results show that the operation of Yili-Kuche line will realize inter-supply between north and south of Xinjiang power, and complementation between hydropower and photovoltaic power; lower the Isolated running risk of Yili region after tripping of Yili-Wusu line; improve the angle stability and small disturbance stability of Xinjiang power grid and upgrade the outbound power delivery capacity of Yili and Kuche region.

Key words: Yili-Kuche, safety and stability, short-circuit current, small disturbance stability, transmission capacity

CLC Number: