[1] 钱伟康,方宗达. 影响时分割乘法器准确度的主要因素分析[J]. 上海理工大学学报,2002,24(3):268-271. QIAN Weikang, FANG Zongda. Analysis on main factors influencing accuracy of time-division multiplier[J]. University of Shanghai for Science and Technology, 2002, 24(3): 268-271. [2] 张宝,杨涛,项谨,等. 电网瞬时故障时汽轮机汽门快控误动作原因分析[J]. 中国电力,2014,47(5):18-22. ZHANG Bao, YANG Tao, XIANG Jin, et al. The cause analysis of steam turbine valve control misoperation caused by grid instantaneous fault [J]. Electric Power, 2014, 47(5): 18-22. [3] 过小玲,郑渭建. 取消东汽机组PLU保护的可行性探讨[J]. 浙江电力,2013(1):52-54. GUO Xiaoling, ZHENG Weijian. Exploration on feasibility of canceling Dongqi unit PLU protection[J]. Zhejiang Electric Power, 2013(1): 52-54. [4] 田丰,陈兴华,罗向东,等. 完善机组涉网控制提高电网可靠性[J]. 电力系统及其自动化学报,2010,22(1):116-119. TIAN Feng, CHEN Xinghua, LUO Xiangdong, et al. Perfect of unit control functions with grid to improve reliability of grid [J]. Proceedings of the CSU-EPSA, 2010, 22(1): 116-119. [5] 袁宇波.变压器差动保护理论分析[D]. 南京:东南大学,2006. [6] 景敏慧,孔霄迪,覃松涛,等. P类电流互感器饱和原因分析及对策[J]. 电力系统自动化,2007,31(21):94-97. JING Minhui, KONG Xiaodi, QIN Songtao, et al. Cause analysis on the saturation of P class current transformers and its countermeasures [J]. Automation of Electric Power Systems, 2007, 31(21): 94-97. [7] 樊丽琴,张保会,葛耀中. 有功功率实时计算方法及其应用分析[J]. 电力系统及其自动化学报,1994,6(1):9-18. FAN Liqin, ZHANG Baohui, GE Yaozhong. Analysis of active power real time calculation method and its application [J]. Proceedings of the CSU-EPSA, 1994, 6(1): 9-18. [8] 董亮,马皓,王小瑞,等. 基于滑动平均电压电流相移的数字化功率计算方法[J]. 电力系统及其自动化,2012,36(5):51-56. DONG Liang, MA Hao, WANG Xiaorui, et al. A modified digital power calculating method based on sliding averaging and phase shifting of voltage and current[J]. Automation of Electric Power Systems, 2012, 36(5): 51-56. |