Commissioning Test and Tuning of 600-MW-class Wet Electrostatic Precipitators

YANG Qunfa, HOU Jianxiong, CHEN Guanming   

  1. Jinwan Power Plant Co., Ltd., Zhuhai 519050, China
  • Received:2015-04-13 Online:2015-11-25 Published:2015-08-25

Abstract: Recently, there have been a lot of new WESPs commissioning in spite of little practical experience. Therefore, it is necessary to summarize the tuning and operating experience of WESPs. Through the analysis on the problems coming up in the 600-MW class WESP of Zhuhai Jinwan Power Plant in Guangdong Province, the corresponding technical improvement and operation adjustment measures are put forward, which ensures smooth WESP commissioning and eventually super low emission from the generation unit is achieved.

Key words: coal-fired power, wet electrostatic precipitator, project commissioning, operation adjustment