[1] 刘振亚. 中国电力与能源[M]. 北京:中国电力出版社,2012. LIU Zhen-ya. Electric power and energy in China[M]. Beijing: China Electric Power Press, 2012. [2] 欧阳予,汪达升. 国际核能应用及其前景展望与我国核电的发展[J]. 华北电力大学学报,2007,34(5):1-10. OU Yang-yu, WANG Da-sheng. Internal nuclear power application and its prospect forecast and our country nuclear electricity development [J]. Journal of North China Electric Power University, 2007, 34(5): 1-10. [3] 赵洁,刘涤尘,吴耀文. 压水堆核电厂接入电力系统建模[J]. 中国电机工程学报,2009,29(31):8-13. ZHAO Jie, LIU Di-chen, WU Yao-wen. Modelling of pressurized water reactor nuclear power plant integrated into power system simulation [J]. Proceedings of the CSEE, 2009, 29(31): 8-13. [4] 赵洁,刘涤尘,杨楠,等. 核电机组参与电网调峰的运行方式及效益分析[J]. 电网技术,2012,36(12):250-255. ZHAO Jie, LIU Di-chen, YANG Nan, et al . Operation mode and benefits of nuclear power plant participating in peak load regulation of power system [J]. Power System Technology, 2012, 36(12): 250-255. [5] 陈汉雄,郑勇. 大容量核电机组接入川渝电网适应性及参与系统调峰研究[J]. 中国电力,2011,44(3):1-5. CHEN Han-xiong, ZHENG Yong. Adaptability of large-capacity nuclear power plants accessing Sichuan and Chongqing grids and ability of participating in system peak-load regulation [J]. Electric Power, 2011, 44(3): 1-5. [6] 傅旭,黄明良. 大容量核电机组接入西北电网适应性分析[J]. 电力建设,2012,33(5):28-31. FU Xu, HUANG Ming-liang. Adaptability analyses of large- capacity nuclear power units accessing northwest grid [J]. Electric Power Construction, 2012, 33(5): 28-31. [7] 余文奇,彭波,郑秀波. 压水堆核电机组负荷跟踪能力综述[J].中国能源,2011,33(3):38-40,45. YU Wen-qi, PENG Bo, ZHENG Xiu-bo. Overview on load following ability of pressurized water reactors [J]. Energy of China, 2011, 33(3): 38-40, 45. [8] 程路,白建华,贾德香. 核电对2020 年非化石能源15%目标及电力系统的影响[J]. 能源技术经济,2011,23(7):10-13. CHENG Lu, BAI Jian-hua, JIA De-xiang, Influence of nuclear power on the 15% non-fossil energy target for 2020 and power system [J]. Energy Technology and Economics, 2011, 23(7): 10-13. [9] “十二五”及中长期电力发展研究[R]. 国网能源研究院,2010年11月. |