[1] 陈厚肇. 热工自动化[M]. 北京:中国电力出版社,2006:9-34. [2] 朱北恒.火电厂热工自动化系统试验[M]. 北京:中国电力出版社,2006:12-25. [3] 刘磊,高爱国,骆意. 超超临界直流炉机组协调控制策略[J].中国电力,2011,44(10):69-73. LIU Lei, GAO Ai-guo, LUO Yi. Coordinated control strategy in unit with ultra-supercritical once-through boiler[J]. Electric Power, 2011,44(10):69-73. [4] 张秋生,梁华,胡晓花,等.超超临界机组两种典型协调控制方案[J]. 中国电力,2011,44(10):74-79. ZHANG Qiu-sheng, LIANG Hua, HU Xiao-hua, et al . Two kinds of typical coordinated control systems in ultra-supercritical units[J]. Electric Power, 2011,44(10):74-79. [5] 刘吉臻,田亮,曾德良,等. 660 MW机组负荷-压力非线性特性的分析[J]. 动力工程,2005,25(4):533-540. LIU Ji-zhen, TIAN Liang, ZENG De-liang, et al . Analysis on the nonlinearity of load-pressure characteristics of a 660 MW unit[J]. Journal of Power Engineering, 2005,25(4):533-540. [6] 张铁军,吕剑虹,华志刚. 机炉协调系统的模糊增益调度预测控制[J]. 中国电机工程学报,2005,25(4):158-165. ZHANG Tie-jun, LU Jian-hong, HUA Zhi-gang. Fuzzy gain scheduled model predictive control for boiler-turbine coordinated system[J]. Proceedings of the CSEE, 2005,25(4):158-165. [7] 黄红艳,陈华东. 超临界直流锅炉控制系统的特点及控制方案[J].电力建设,2006,27(3):1-3,13. HUANG Hong-yan, CHEN Hua-dong. Features of control system of supercritical once-through boilers and its control option[J]. Electric Power Construction, 2006, 27(3):1-3,13. [8] 韩忠旭,张智,刘敏,等. 北仑1和2号600 MW单元机组协调控制系统的设计与应用[J].中国电机工程学报,2006,26(18):126-132. HAN Zhong-xu, ZHANG Zhi, LIU Min, et al . Application and design of coordinated control system for No.1 & 2 600 MW unit of Beilun Power Plant[J]. Proceedings of the CSEE, 2006,26(18):126-132. [9] 韩忠旭,齐小红,潘钢,等. 本生直流炉机炉协调控制系统的设计新方法及其工程应用[J]. 中国电机工程学报,2005,25(21):121-127. HAN Zhong-xu, QI Xiao-hong, PAN Gang, et al . A new design method of coordinated control system for once-through boiler and its engineering application[J]. Proceedings of the CSEE, 2005,25(21): 121-127. [10] 张建华,史运涛,侯国莲,等.燃煤电厂协调控制系统故障诊断与容错控制应用研究[J]. 中国电机工程学报,2004,24(8):175-179. ZHANG Jian-hua, SHI Yun-tao, HOU Guo-lian, et al . Research on fault diagnosis and fault tolerant control of the coordinate control system in coal-fired power plant[J]. Proceedings of the CSEE, 2004, 24(8):175-179. [11] 沈炯,陈来九.协调控制系统的专家极点配置自整定方法[J].中国电机工程学报,1995,15(1):8-15. SHEN Jiong, CHEN Lai-jiu. A method for expert pole placement auto-tuning of the coordinated control system[J]. Proceedings of the CSEE, 1995,15(1):8-15. [12] 钱庆生. 600 MW超临界机组控制系统特点与协调控制策略[J]. 热电技术,2008(2):53-56. |