[1] 国家电力监管委员会. 并网发电厂辅助服务管理暂行办法(电监市场[2006] 43号)[Z]. 2006. [2] GRAINGER J, STEVENSON W D. Power system analysis[M]. New York:McGraw-Hill, 1994. [3] 李文沅. 电力系统安全经济运行——模型与方法[M]. 重庆:重庆大学出版社, 1989. [4] 电力行业电网运行与控制标准化技术委员会. 电力系统安全稳定导则:DL 755-2001[S]. 北京:中国电力出版社, 2001. [5] 迟永宁, 刘燕华, 王伟胜, 等. 风电接入对电力系统的影响[J]. 电网技术, 2007, 31(3):77-81 CHI Yongning, LIU Yanhua, WANG Weisheng, et al. Study on impact of wind power integration on power system[J]. Power System Technology, 2007, 31(3):77-81 [6] 雷亚洲. 与风电并网相关的研究课题[J]. 电力系统自动化, 2003, 27(8):84-89 LEI Yazhou. Studies on wind farm integration into power system[J]. Automation of Electric Power Systems, 2003, 27(8):84-89 [7] 张宁, 周天睿, 段长刚, 等. 大规模风电场接入对电力系统调峰的影响[J]. 电网技术, 2010, 34(3):152-158 ZHANG Ning, ZHOU Tianrui, DUAN Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(3):152-158 [8] 国家能源局东北监管局. 东北电力调峰辅助服务市场监管办法(东北监能市场[2014] 374号)[Z]. 2014. [9] 李丰. 考虑大规模风电接入系统的发电优化调度模型及方法研究[D]. 北京:华北电力大学, 2014. [10] 张文韬, 黄镔, 王秀丽, 等. 基于多状态新能源发电模拟的日运行方式及调峰安排研究[J]. 电网技术, 2015, 39(8):2100-2106 ZHANG Wentao, HUANG Bin, WANG Xiuli, et al. Research on daily operation mode and peak load regulation scheduling based on generation simulation of multi-state renewable energy resources[J]. Power System Technology, 2015, 39(8):2100-2106 [11] 静铁岩, 吕泉, 郭琳, 等. 水电-风电系统日间联合调峰运行策略[J]. 电力系统自动化, 2011, 35(22):97-104 JING Tieyan, LU Quan, GUO Lin, et al. An inter-day combined operation strategy of hydro and wind power system for regulating peak load[J]. Automation of Electric Power Systems, 2011, 35(22):97-104 [12] 胡建军, 胡飞雄. 节能发电调度模式下有偿调峰补偿新机制[J]. 电力系统自动化, 2009, 33(10):16-18 HU Jianjun, HU Feixiong. A novel compensation mechanism of remunerative peak load regulation under energy-saving dispatch framework[J]. Automation of Electric Power Systems, 2009, 33(10):16-18 [13] WANG Yang, XIA Q, KANG Chongqing. Unit commitment with volatile node injections by using interval optimization[J]. IEEE Transactions on Power Systems, 2011, 26(3):1705-1713. [14] 张伯明, 陈寿孙, 严正. 高等电力网络分析[M]. 北京:清华大学出版社, 2007. [15] 汪洋, 夏清, 康重庆. 考虑电网N-1闭环安全校核的最优安全发电计划[J]. 中国电机工程学报, 2011, 31(10):39-45 WANG Yang, XIA Qing, KANG Chongqing. Optimal security constrained generation scheduling considering closed-loop N-1 security correction[J]. Proceedings of the CSEE, 2011, 31(10):39-45 [16] YANG Zhifang, ZHONG Haiwang, XIA Qing, et al. Optimal transmission switching with short-circuit current limitation constraints[J]. IEEE Transactions on Power Systems, 2011, 31(2):1278-1288. [17] IBM ILOG CPLEX Optimization studio, international business machines corp (IBM).[EB/OL]. (2015-12-12)[2016-09-23]. http://www-03.ibm.com/soft-ware/products/en/ibmilogcpleoptistud. [18] Department of Electrical Engineering, University of Washington. Power system test case archive[EB/OL]. (2015-12-12)[2016-9-25]. http://www.ee.washington.edu/research/pstca/index.html |